Back to search
SAM.govNotice 584785ebe7aa45d99672be04600cd9c9

Installing 3 Different Wall Signage

Country
United States
Published
February 3, 2026
Deadline
February 6, 2026

Description

{"description":" On 2/3/2026 Amendment 01 was issued to answer the Q&A and provide an additional drawing document. See attached files for more. \n\n Fermi National Accelerator Laboratory (FNAL) is requesting proposals for the supply and installation of 3 Signages in 3 different locations (HEERC, D0, SBN).. The project is located on the Fermi National Accelerator Laboratory (Fermilab) Site, adjacent to the city of Batavia, Illinois. The project is in Du Page County. \n\n The Subcontractor shall furnish all required supervision, labor, materials, tools, and equipment necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings and technical specifications. \n\n For more detailed information, please review the attached SOW entitled, “Exhibit C - Statement of Work- Wall Signage.” \n\n Proposals are due 02/06/2026 at 5pm CT. \n"} Solicitation Number: 377679BB Type: Solicitation Base Type: Solicitation NAICS: 238320 Classification Code: Y1PZ Response Deadline: 2026-02-06T17:00:00-06:00 Office Address: Batavia, IL Place of Performance: Batavia, Illinois, 60510 POC: Brett Buzzelli, buzzelli@fnal.gov, 6308404119 {"description":" On 2/3/2026 Amendment 01 was issued to answer the Q&A and provide an additional drawing document. See attached files for more. \n\n Fermi National Accelerator Laboratory (FNAL) is requesting proposals for the supply and installation of 3 Signages in 3 different locations (HEERC, D0, SBN).. The project is located on the Fermi National Accelerator Laboratory (Fermilab) Site, adjacent to the city of Batavia, Illinois. The project is in Du Page County. \n\n The Subcontractor shall furnish all required supervision, labor, materials, tools, and equipment necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings and technical specifications. \n\n For more detailed information, please review the attached SOW entitled, “Exhibit C - Statement of Work- Wall Signage.” \n\n Proposals are due 02/06/2026 at 5pm CT. \n"}

Open original notice

Get tenders like this in one daily alert

Use this notice as context when Tenqual drafts your search scope and fit criteria.

Create free alert
Installing 3 Different Wall Signage tender | Tenqual