BEACH RENOURISHMENT PALM BEACH MIDTOWN PALM BEACH COUNTY, FLORIDA
- Country
- United States
- Published
- October 10, 2025
- Deadline
- October 20, 2025
Description
{"description":" This project will renourish shoreline in Palm Beach County, between Florida Department of Environmental Protection (FDEP) Range Monuments R-92.1 and R-102. The project includes construction of a beach berm. The sand for the project will be sourced from a combination of borrow sources in the area, Palm Beach Harbor Entrance Channel and Settling Basins, Northern Borrow Area 1, and Northern Borrow Area 2. Palm Beach Harbor Entrance Channel and Settling Basins and Northern Borrow Area 2 are approximately 4 nautical miles from the midpoint of the project fill area. Northern Borrow Area 1 is approximately 5 nautical miles from the midpoint of the project fill area. See Section 01 57 20 ENVIRONMENTAL PROTECTION. Project work also includes, but is not limited to, endangered species observers (hopper dredges only), sea turtle trawling (hopper dredges only), beach tilling, vibration control and monitoring, environmental species monitoring, and turbidity monitoring. \n\n \n\n A complete copy of amenment 0001 was uploaded to SAM.gov. Please make sure you download amendment 0001 from this site because includes all necessary changes to specifications and plans. The version currently posted in PIEE is missing some of the changes to the specifications and the drawings. \n"} Solicitation Number: W912EP25BA013 Type: Solicitation Base Type: Solicitation NAICS: 237990 Classification Code: Z2KF Response Deadline: 2025-10-20T13:00:00-04:00 Office Address: JACKSONVILLE, FL POC: Meredith Coad, Meredith.C.Coad@usace.army.mil POC: Ruth C. Rodriguez, Ruth.C.Rodriguez@usace.army.mil {"description":" This project will renourish shoreline in Palm Beach County, between Florida Department of Environmental Protection (FDEP) Range Monuments R-92.1 and R-102. The project includes construction of a beach berm. The sand for the project will be sourced from a combination of borrow sources in the area, Palm Beach Harbor Entrance Channel and Settling Basins, Northern Borrow Area 1, and Northern Borrow Area 2. Palm Beach Harbor Entrance Channel and Settling Basins and Northern Borrow Area 2 are approximately 4 nautical miles from the midpoint of the project fill area. Northern Borrow Area 1 is approximately 5 nautical miles from the midpoint of the project fill area. See Section 01 57 20 ENVIRONMENTAL PROTECTION. Project work also includes, but is not limited to, endangered species observers (hopper dredges only), sea turtle trawling (hopper dredges only), beach tilling, vibration control and monitoring, environmental species monitoring, and turbidity monitoring. \n\n \n\n A complete copy of amenment 0001 was uploaded to SAM.gov. Please make sure you download amendment 0001 from this site because includes all necessary changes to specifications and plans. The version currently posted in PIEE is missing some of the changes to the specifications and the drawings. \n"}
Get tenders like this in one daily alert
Use this notice as context when Tenqual drafts your search scope and fit criteria.