Dana Point West Breakwater Repair Project
- Country
- United States
- Published
- January 26, 2026
- Deadline
- January 28, 2026
Description
{"description":" *Amendment 0002 - Updated section 00 70 00, Updated Section 00 21 13 regarding Virtual bid opening procedure, uploaded opening participation instructions, Updated Section 00 73 46 Wage Determination* *Amendment 0001- Updated SF1442 with bid opening date extended to January 28,2026, updated Section 00 45 00, Section 00 70 00 Section 00 73 46, Section 35 31 23, Sheet C Revised general sheet notes, uploaded Site Visit Sign in sheet* - Complete repair of the west breakwater located at the Dana Point Harbor. The work consists of replacing displaced armor stone and resetting existing stone to interlock with the new stone. Approximately 3,500 tons of new armor stone to be placed on the breakwater. Approximately 45,000 cubic yards of sediment may be dredged for access to the breakwater. All dredged material will be beneficially used as nearshore nourishment offshore of Doheny State Beach. Attending the project site visit is not required but strongly encouraged to attend in its entirety. Refer to Site Visit Document attached for further details. \n"} Solicitation Number: W912PL26BA001 Type: Solicitation Base Type: Solicitation NAICS: 237990 Classification Code: Z1KZ Response Deadline: 2026-01-28T13:00:00-08:00 Office Address: LOS ANGELES, CA Place of Performance: 92629 POC: Ashley Powell, ashley.s.powell@usace.army.mil, 2134523241 {"description":" *Amendment 0002 - Updated section 00 70 00, Updated Section 00 21 13 regarding Virtual bid opening procedure, uploaded opening participation instructions, Updated Section 00 73 46 Wage Determination* *Amendment 0001- Updated SF1442 with bid opening date extended to January 28,2026, updated Section 00 45 00, Section 00 70 00 Section 00 73 46, Section 35 31 23, Sheet C Revised general sheet notes, uploaded Site Visit Sign in sheet* - Complete repair of the west breakwater located at the Dana Point Harbor. The work consists of replacing displaced armor stone and resetting existing stone to interlock with the new stone. Approximately 3,500 tons of new armor stone to be placed on the breakwater. Approximately 45,000 cubic yards of sediment may be dredged for access to the breakwater. All dredged material will be beneficially used as nearshore nourishment offshore of Doheny State Beach. Attending the project site visit is not required but strongly encouraged to attend in its entirety. Refer to Site Visit Document attached for further details. \n"}
Get tenders like this in one daily alert
Use this notice as context when Tenqual drafts your search scope and fit criteria.