Back to search
TEDNotice 608244-2025

KNARVIK SEWAGE TREATMENT PLANT, KNARA E2 CONSTRUCTION CONTRACT

Buyer
Alver kommune
Published
September 17, 2025

Description

Alver municipality in Vestland shall establish a new treatment facility for treatment of sewage water from Knarvik and nearby areas. The facility shall be established at Kvassneset in Knarvik and it is close to Kvassnesstemma and a hiking area around it. In addition to the erection of the sewage treatment facility with personnel buildings, this contract also deals with the construction of structural works with a sewage pump station and an access road thereof. The construction contract (this contract) concerns (not exhaustive list): • Preparation of the site • Complete construction work for the buildings • Delivery and assembly of a gantry crane, facilitating use in the assembly phase • Construction auxiliary work for the machine contract • HVAC for the entire contract, including odour removal installations • Electrical work for the entire contract including solar panel installations • Establishment of 10 ground heat wells with a depth of approx. 300 metres each • Exit from Kvassnesvegen and road to the plant, temporary construction road in route for a water and sewage ditch between the treatment facility and down to the existing foot/cycle path in the south as well as a permanent access road to the sewage pump station. • Complete water and sewage works with water, storm water and wastewater pipelines including pump pipeline • Establish two emission pipelines in sea to cote -60 in Osterfjorden • Concrete bridge over stream on access road to the sewage pump station • Establishment of activity tracks and a waiting place facilitated for longer stays with a campfire place and gapahuk with benches • Establishment of a universally designed ramp that slings up between the trees to a viewing platform at the southern end of the building and that connects the facility to the existing footpath around Kvassnestemma • Provide joint rigging and operational services for other co-ordinated contracts in the project • Performs the role as a main company in accordance with the Working Environment Act § 2-2 and the Internal Control Regulations § 6 with responsibility for co-ordination of the individual companies ́ health, environment and safety work • Responsibility for coordination and progress control of co-ordinated contracts.

Open original notice

Get tenders like this in one daily alert

Use this notice as context when Tenqual drafts your search scope and fit criteria.

Create free alert
KNARVIK SEWAGE TREATMENT PLANT, KNARA E2 CONSTRUCTION CONTRACT tender | Tenqual