C1DA--657A4-26-101, Replace Electrical Switchboards Building 1, 7 and 20
- Country
- United States
- Published
- January 26, 2026
- Deadline
- February 17, 2026
Description
{"description":"The purpose of this modification is to answer questions and to provide an updated Scope of Work for A/E Services. \nQuestion 1:\nIf known, what is the anticipated schedule for Bidding and construction of this project?\nAnswer:\nThe schedule for bidding and construction has not yet been finalized. Typically, our process involves issuing bids promptly upon completion of the design phase and proceeding to construction accordingly. However, this is contingent upon the availability of funding, which is beyond our direct control. At this time, we are unable to specify when or if the necessary funds will be allocated to advance to the bidding and construction stages.\nQuestion 2: \nTo ensure our SF330 is responsive, could you please clarify whether this project is intended to be:\n Primarily an electrical infrastructure upgrade, or\n A more comprehensive multi-discipline A/E project as described in the Scope of Work sections noted above.\nAnswer:\nThis is primarily an electrical infrastructure upgrade. There will be very minimal interdisciplinary work, please see updated Scope of Work for A/E Services below.\n\nSCOPE OF WORK FOR A/E SERVICES\nDesign Development: The A/E shall make investigations necessary to thoroughly evaluate the area, including interviewing the staff impacted as a result of this project. The A/E shall make investigations necessary to thoroughly evaluate the area and systems. All designs shall be in accordance with A/E Submission Instructions for Minor and NRM Construction Program, Program Guide PG-18-15, Volume C. \nThe A/E will be required to design within the construction budget. The design shall be fully compliant per VHA Construction Publications. \nArchitect or architect/engineer (A/E) firm shall be capable of preparing all design documentation. Prime contractor shall have, but not limited to, the following licensed/registered specialty disciplines as members of their firm/team: Architect, Mechanical Engineer, Electrical Engineer, Interior Designers, and Cost Estimators. The team shall have demonstrable experience in programming, planning and design of complex healthcare projects of a similar nature.\nThe A/E must design using all current VA standards, design guides, and meet all current codes for mechanical, plumbing, electrical, fire protection, seismic, and life safety. All spaces will be designed to meet the Interagency Security Committee and other relevant physical security guidelines. \nIt is important to emphasize that the A/E shall perform design development, detailed design work, prepare detailed construction documents, keeping in mind that the end results is a completely functional, certified, and fully operational product.\nThe A/E shall provide a phase plan that reduces facility impact during construction.\nAfter award, A/E shall be responsible for conducting site visits for the purpose of data gathering, investigation and documentation of all existing conditions. Perform such investigations as required to accurately verify all existing conditions. Do not rely solely upon \"as built\" drawings. VA personnel will provide assistance with investigating the project site where prior experience with equipment and utilities will produce an appreciable advantage. The A/E firm shall be responsible for site review of the existing facility in order to field verify the owner's existing documents and as-built drawings. Any modifications that are required to be made as a result of the site review shall be communicated to VA and corrected by the A/E firm. \nThe final design documents from a resultant task order will be subject to review and approval (by signature) of all members of an Integrated Project Team (IPT) consisting of medical center personnel. These individuals will be identified by the COR at the first design review meeting.\nAs part of the final submission the A/E shall provide a written synopsis describing the overall scope of the construction project as well as any pertinent information about the project that would assist potential bidders in preparing a comprehensive bid package. This synopsis is intended to be a general description of the project not to exceed four written pages in length. \nThe A/E shall utilize SEPS and FOR REFERENCE SEPS Models for Design Development and FFE Planning in full where applicable. \nThe C&A requirements do not apply, and that a Security Accreditation Package is not required.\nDuring both design and construction, the A/E shall provide to the VA (and eventual construction firm) access to a secure file sharing website (JJP VA prefers Procore or Oracle) for the purpose of posting electronic correspondence too large for email traffic. This file sharing website should have multiple security levels that can be used during construction to manage the exchange of submittals. The A/E shall include both the design and construction cost for Procore as a separate line item.\nThe design shall include phasing throughout the project, with each phase containing a construction boundary to protect patients and workers for construction activities. \nSite investigations will be required to complete a full analysis of the current conditions of the area. All utility services shall be identified and assessed for compliance within the project limits. Deliverables shall include \n\nPreliminary Layout Submission \n Electronic PDF copy\n\nSchematic Submission (minimum of three) (Incorporating programing report) 10%:\n 2 Complete hardcopy sets- 1 full size, 2 half-size; 1 electronic PDF copy\n \nDesign Development Submission (35%):\n1 Complete hardcopy sets- 1 full size, 2 half-size; 1 electronic PDF copy of drawings, specifications and cost estimate)\n\nConstruction Documents Submission (60%)\n3 Complete hardcopy sets- 1 full size, 2 half-size; 1 electronic PDF copy of drawings, specifications and cost estimate. 1 hard copy of specs. Specs should also be provided in an electronic format in both a combined PDF format and in Word. Electronic copy of cost estimate\n\nConstruction Documents Submission (90%)\n4 Complete hardcopy sets- 1 full size, 3 half-size; 1 electronic PDF copy of drawings, 2 hard copies of specs. Specs should be provided in an electronic format in both a combined PDF format and in Word. Electronic copy of cost estimate (1 half size drawing, set of specs (clean) and cost estimate are to be provided to the contracting officer) \n\nConstruction Documents Submission (100%)\n4 Complete hardcopy sets- 1 full size, 3 half-size; 1 electronic PDF copy, 2 hard copies of specs. Specs should be provided in an electronic format in both a combined PDF format and in Word. Electronic copy of cost estimate.\n \nBid Document Submission (Final):\n3 complete hard copy sets- 1 full size, 2 half size. 4 sets of bound specification. Cost estimate. Electronic copies of drawings and specification both PDF and Auto-CAD 2025, as well as Revit model(s). \n\nConformed Drawings:\nIn the event bid alternatives are taken as a result of the bidding process, AE shall develop and provide an electronic conformed set of drawings based on the bid item(s) taken.\n \nAs-Built Drawings:\n1 complete hard copy full size set and Electronic copies both PDF and Auto-CAD with bound x-refs. Provide Mylar Set. \n\nThe A/E shall hire a third party firm to conduct fire protection and life safety reviews of the 60% and 100% design submissions compliant with VHA Directive 7712.\n\nEND OF MODIFICATION\n"} Solicitation Number: 36C25526R0054 Type: Presolicitation Base Type: Presolicitation NAICS: 541330 Classification Code: C1DA Response Deadline: 2026-02-17T14:00:00-06:00 Office Address: LEAVENWORTH, KS Place of Performance: Poplar Bluff, Missouri, 63901 POC: Lucia Cowsert, Lucia.Cowsert@va.gov, (913) 758-9912 {"description":"The purpose of this modification is to answer questions and to provide an updated Scope of Work for A/E Services. \nQuestion 1:\nIf known, what is the anticipated schedule for Bidding and construction of this project?\nAnswer:\nThe schedule for bidding and construction has not yet been finalized. Typically, our process involves issuing bids promptly upon completion of the design phase and proceeding to construction accordingly. However, this is contingent upon the availability of funding, which is beyond our direct control. At this time, we are unable to specify when or if the necessary funds will be allocated to advance to the bidding and construction stages.\nQuestion 2: \nTo ensure our SF330 is responsive, could you please clarify whether this project is intended to be:\n Primarily an electrical infrastructure upgrade, or\n A more comprehensive multi-discipline A/E project as described in the Scope of Work sections noted above.\nAnswer:\nThis is primarily an electrical infrastructure upgrade. There will be very minimal interdisciplinary work, please see updated Scope of Work for A/E Services below.\n\nSCOPE OF WORK FOR A/E SERVICES\nDesign Development: The A/E shall make investigations necessary to thoroughly evaluate the area, including interviewing the staff impacted as a result of this project. The A/E shall make investigations necessary to thoroughly evaluate the area and systems. All designs shall be in accordance with A/E Submission Instructions for Minor and NRM Construction Program, Program Guide PG-18-15, Volume C. \nThe A/E will be required to design within the construction budget. The design shall be fully compliant per VHA Construction Publications. \nArchitect or architect/engineer (A/E) firm shall be capable of preparing all design documentation. Prime contractor shall have, but not limited to, the following licensed/registered specialty disciplines as members of their firm/team: Architect, Mechanical Engineer, Electrical Engineer, Interior Designers, and Cost Estimators. The team shall have demonstrable experience in programming, planning and design of complex healthcare projects of a similar nature.\nThe A/E must design using all current VA standards, design guides, and meet all current codes for mechanical, plumbing, electrical, fire protection, seismic, and life safety. All spaces will be designed to meet the Interagency Security Committee and other relevant physical security guidelines. \nIt is important to emphasize that the A/E shall perform design development, detailed design work, prepare detailed construction documents, keeping in mind that the end results is a completely functional, certified, and fully operational product.\nThe A/E shall provide a phase plan that reduces facility impact during construction.\nAfter award, A/E shall be responsible for conducting site visits for the purpose of data gathering, investigation and documentation of all existing conditions. Perform such investigations as required to accurately verify all existing conditions. Do not rely solely upon \"as built\" drawings. VA personnel will provide assistance with investigating the project site where prior experience with equipment and utilities will produce an appreciable advantage. The A/E firm shall be responsible for site review of the existing facility in order to field verify the owner's existing documents and as-built drawings. Any modifications that are required to be made as a result of the site review shall be communicated to VA and corrected by the A/E firm. \nThe final design documents from a resultant task order will be subject to review and approval (by signature) of all members of an Integrated Project Team (IPT) consisting of medical center personnel. These individuals will be identified by the COR at the first design review meeting.\nAs part of the final submission the A/E shall provide a written synopsis describing the overall scope of the construction project as well as any pertinent information about the project that would assist potential bidders in preparing a comprehensive bid package. This synopsis is intended to be a general description of the project not to exceed four written pages in length. \nThe A/E shall utilize SEPS and FOR REFERENCE SEPS Models for Design Development and FFE Planning in full where applicable. \nThe C&A requirements do not apply, and that a Security Accreditation Package is not required.\nDuring both design and construction, the A/E shall provide to the VA (and eventual construction firm) access to a secure file sharing website (JJP VA prefers Procore or Oracle) for the purpose of posting electronic correspondence too large for email traffic. This file sharing website should have multiple security levels that can be used during construction to manage the exchange of submittals. The A/E shall include both the design and construction cost for Procore as a separate line item.\nThe design shall include phasing throughout the project, with each phase containing a construction boundary to protect patients and workers for construction activities. \nSite investigations will be required to complete a full analysis of the current conditions of the area. All utility services shall be identified and assessed for compliance within the project limits. Deliverables shall include \n\nPreliminary Layout Submission \n Electronic PDF copy\n\nSchematic Submission (minimum of three) (Incorporating programing report) 10%:\n 2 Complete hardcopy sets- 1 full size, 2 half-size; 1 electronic PDF copy\n \nDesign Development Submission (35%):\n1 Complete hardcopy sets- 1 full size, 2 half-size; 1 electronic PDF copy of drawings, specifications and cost estimate)\n\nConstruction Documents Submission (60%)\n3 Complete hardcopy sets- 1 full size, 2 half-size; 1 electronic PDF copy of drawings, specifications and cost estimate. 1 hard copy of specs. Specs should also be provided in an electronic format in both a combined PDF format and in Word. Electronic copy of cost estimate\n\nConstruction Documents Submission (90%)\n4 Complete hardcopy sets- 1 full size, 3 half-size; 1 electronic PDF copy of drawings, 2 hard copies of specs. Specs should be provided in an electronic format in both a combined PDF format and in Word. Electronic copy of cost estimate (1 half size drawing, set of specs (clean) and cost estimate are to be provided to the contracting officer) \n\nConstruction Documents Submission (100%)\n4 Complete hardcopy sets- 1 full size, 3 half-size; 1 electronic PDF copy, 2 hard copies of specs. Specs should be provided in an electronic format in both a combined PDF format and in Word. Electronic copy of cost estimate.\n \nBid Document Submission (Final):\n3 complete hard copy sets- 1 full size, 2 half size. 4 sets of bound specification. Cost estimate. Electronic copies of drawings and specification both PDF and Auto-CAD 2025, as well as Revit model(s). \n\nConformed Drawings:\nIn the event bid alternatives are taken as a result of the bidding process, AE shall develop and provide an electronic conformed set of drawings based on the bid item(s) taken.\n \nAs-Built Drawings:\n1 complete hard copy full size set and Electronic copies both PDF and Auto-CAD with bound x-refs. Provide Mylar Set. \n\nThe A/E shall hire a third party firm to conduct fire protection and life safety reviews of the 60% and 100% design submissions compliant with VHA Directive 7712.\n\nEND OF MODIFICATION\n"}
Get tenders like this in one daily alert
Use this notice as context when Tenqual drafts your search scope and fit criteria.