C1DA--AE Expand Chiller Plant 583-25-101
- Country
- United States
- Published
- December 3, 2025
- Deadline
- December 11, 2025
Description
{"description":"Description of the services needed:\nThe Richard L Roudebush Veterans Administration Medical Center (RLRVAMC), Indianapolis, IN, has a requirement to improve the comfort, operation, reliability and energy efficiency of the chilled water system that services the RLRVAMVC campus encompassing six (6) buildings and over one million square feet of clinical, support and administrative space. \nThe project objective is for the Architect/Engineering (AE) team to provide a comprehensive investigation of the existing chilled water system including the chiller plant, distribution piping, Pumps, valves and terminal units located within the various buildings on campus. This investigation shall include a detailed review of all chiller plant equipment for operating, reliability and energy efficiency. The objective is to deliver a complete A/E design package that includes detailed study, analysis, and full construction design to modernize and potentially expand the existing chiller plant. The design shall address all systems including mechanical, electrical, plumbing, controls, civil, structural, and architectural aspects as needed to ensure operational resilience and compliance with VA standards and applicable codes.\nThe chiller plan assessment shall investigate both mechanical and electrical components of the plant. The review shall also include an investigation of the size and condition of the distribution System between the chiller plant and buildings. Further the investigation shall include a detailed review of the condition, reliability and energy efficiency of the air handling units (AHU) and fan coil Units (FCU) within all buildings. In conjunction with this investigation, the AE shall also provide a detailed energy model under both normal and epidemic modes of operation. Once the investigation of the physical conditions of the chilled water system and the energy modeling has been completed, the AE, in conjunction with the VA, shall determine the extent of new equipment to be purchased, which items of equipment shall be rebuilt/refurbished and the final configuration of equipment including controls and control schemes to render a complete chilled water system operating in a reliable and energy efficient manner. \nRequested information:\nTo aid acquisition planning, we re seeking capable and interested firms for the above requirement. If your firm meets those criteria and would like to take in the selection process please send the point of contract (luke.turner@va.gov) the following, via email:\nFirm s Name and\nSocio-Economic Status. \n\n"} Solicitation Number: 36C25026R0036 Type: Sources Sought Base Type: Sources Sought NAICS: 541310 Classification Code: C1DA Response Deadline: 2025-12-11T10:00:00-05:00 Office Address: DAYTON, OH POC: Contracting Officer, luke.turner@va.gov, 513-559-3712 {"description":"Description of the services needed:\nThe Richard L Roudebush Veterans Administration Medical Center (RLRVAMC), Indianapolis, IN, has a requirement to improve the comfort, operation, reliability and energy efficiency of the chilled water system that services the RLRVAMVC campus encompassing six (6) buildings and over one million square feet of clinical, support and administrative space. \nThe project objective is for the Architect/Engineering (AE) team to provide a comprehensive investigation of the existing chilled water system including the chiller plant, distribution piping, Pumps, valves and terminal units located within the various buildings on campus. This investigation shall include a detailed review of all chiller plant equipment for operating, reliability and energy efficiency. The objective is to deliver a complete A/E design package that includes detailed study, analysis, and full construction design to modernize and potentially expand the existing chiller plant. The design shall address all systems including mechanical, electrical, plumbing, controls, civil, structural, and architectural aspects as needed to ensure operational resilience and compliance with VA standards and applicable codes.\nThe chiller plan assessment shall investigate both mechanical and electrical components of the plant. The review shall also include an investigation of the size and condition of the distribution System between the chiller plant and buildings. Further the investigation shall include a detailed review of the condition, reliability and energy efficiency of the air handling units (AHU) and fan coil Units (FCU) within all buildings. In conjunction with this investigation, the AE shall also provide a detailed energy model under both normal and epidemic modes of operation. Once the investigation of the physical conditions of the chilled water system and the energy modeling has been completed, the AE, in conjunction with the VA, shall determine the extent of new equipment to be purchased, which items of equipment shall be rebuilt/refurbished and the final configuration of equipment including controls and control schemes to render a complete chilled water system operating in a reliable and energy efficient manner. \nRequested information:\nTo aid acquisition planning, we re seeking capable and interested firms for the above requirement. If your firm meets those criteria and would like to take in the selection process please send the point of contract (luke.turner@va.gov) the following, via email:\nFirm s Name and\nSocio-Economic Status. \n\n"}
Get tenders like this in one daily alert
Use this notice as context when Tenqual drafts your search scope and fit criteria.