Back to search
Contracts FinderNotice 883d2c15-2c39-43d1-a129-f452ef686b0b-860114

Structural Steelwork to new Link Bridge, Canopy and Lift Shaft Enclosure

Buyer
Mace Dragados
Country
United Kingdom
Published
August 22, 2025
Deadline
August 26, 2025

Description

Mace Dragados require a steelwork subcontractor to carry out the design (to Stage 5) supply, fabrication, installation and erection of the following 1. A 13200mm long 2100mm wide link bridge connecting the Maria Fidelis Old School Building and the Maria Fidelis Building Accommodation first floors. Includes steel structure, concrete foundations and cladding. 2. Steel frame structure, concrete foundations and external cladding for a 8 person lift shaft on the Maria Old School Building providing access to ground level, bridge level, first floor, second floor and roof. Lift to be installed by Others. 3. A 10m x 4m steel canopy at the entrance of the Maria Fidelis Old School Building. See attached drawings

Open original notice

Get tenders like this in one daily alert

Use this notice as context when Tenqual drafts your search scope and fit criteria.

Create free alert
Structural Steelwork to new Link Bridge, Canopy and Lift Shaft Enclosure tender | Tenqual