Back to search
SAM.govNotice cc06262e0f5f45d39538bb3aeeac54aa

USCGC WAESCHE FQ3 FY26 Dock Side (DS)

Country
United States
Published
January 16, 2026
Deadline
January 28, 2026

Description

{"description":" This requirement is for the Contractor to provide all necessary labor, services, supplies, materials, equipment power, accessories, personnel, and other things as necessary, except otherwise specified to perform dockside repairs to the USCGC WAESCHE (WMSL-751), a 418-foot National Security Cutter in accordance with the solicitation, schedule, and specifications. \n\n Work includes, but is not limited to the following: \n\n D-001 Tanks (Aviation Fuel Service), Clean and Inspect \n\n O-002 Tanks, Partial Preserve (30%) \n\n D-003 Tanks (MP Fuel Stowage and Overflow), Clean and Inspect \n\n D-004 Tanks (MP Fuel Service), Clean and Inspect \n\n D-005 Tanks (Ballast), Clean and Inspect \n\n D-006 Grey Water Holding Tank(s) and Lift Stations, Clean and Inspect \n\n D-007 Sewage Holding Tank(s), Clean and Inspect \n\n D-008 Sewage Piping, Clean, Flush and Pipe Repair \n\n D-009 Talon Grid (Type 18-08), Inspect and Test \n\n D-010 Fire Detection System Inspect and Test \n\n D-011 Tenting (Fore Deck), Provide \n\n D-012 Deck Covering (Slip-Resistant) Fore Deck, Renew \n\n D-013 Deck Covering (Polymeric), Renew \n\n D-014 Deck Covering (Polymeric), Repair and Seal \n\n D-015 Decks, Full Preservation \n\n D-016 Dry Provision Storeroom, Modify \n\n D-017 Fire Prevention, Provide \n\n D-018 Temporary Services, Provide \n\n Amendment 0001: the following questions were received in response to this solicitation. A revised Specification file is added to the files. The three (3) questions and responses received are: \n\n Item 18, Table 1 has both “Storage – General” and “Dry Stores” selected for KTR to provide. Does USG intend for KTR to provide a storage facility for each of these Table 1-line items, or only one storage facility that satisfies SFLC Std Spec 8635 para 3.3.14.5 and Table 7 (Dry Stores)? KTR may use one facility that satisfies those requirements for Storage – General and Dry Stores in 8635 para 3.3.14.5 Table 7. \n\n D-008: Specification references chemical SDS’s in 3.3 but does not require chemical cleaning. Historically due to system design, mechanically cleaning is not sufficient to clean this system. Is mechanically cleaning an option or will chemical cleaning be required (KTR recommends)? The intent is to require chemical cleaning. We worded the spec that way because we couldn’t require a specific product, but rather a type/quality of product, hence “Rydlyme or equivalent.” It was an oversight to not specify it must be chemical cleaning. \n\n D-018: Should contractor plan to have temp services only for the duration of sewage pipe cleaning in D-008 or for complete duration of project due to unknown amount of affected piping repairs in para 3.7.2? KTR shall provide temp services for the time required to perform the following: \n\n \n\t Full sewage pipe cleaning \n\t Renewal of 14 known pipe sections in Table 1 (37 ft) \n \n\n CG acknowledges the unknown time required to repair the additional 50 feet of piping referenced in para 3.7.2, due to factors such as location, interferences, etc. KTR proposals shall include the cost of piping and fittings. Additional labor and time required for temp services may be subject to a CR following inspections IAW para 3.6 and 3.6.1, if additional repairs cannot be completed during the duration of repairs IAW base SOW. \n"} Solicitation Number: 70Z08526QLREP0007 Type: Combined Synopsis/Solicitation Base Type: Combined Synopsis/Solicitation NAICS: 336611 Classification Code: J020 Response Deadline: 2026-01-28T10:00:00-08:00 Office Address: ALAMEDA, CA Place of Performance: Alameda, California, 94501 POC: William Zittle, william.r.zittle@uscg.mil, 5716086517 POC: Valerie S Rivera-Chase, Valerie.S.RiveraChase@uscg.mil, 5104375422 {"description":" This requirement is for the Contractor to provide all necessary labor, services, supplies, materials, equipment power, accessories, personnel, and other things as necessary, except otherwise specified to perform dockside repairs to the USCGC WAESCHE (WMSL-751), a 418-foot National Security Cutter in accordance with the solicitation, schedule, and specifications. \n\n Work includes, but is not limited to the following: \n\n D-001 Tanks (Aviation Fuel Service), Clean and Inspect \n\n O-002 Tanks, Partial Preserve (30%) \n\n D-003 Tanks (MP Fuel Stowage and Overflow), Clean and Inspect \n\n D-004 Tanks (MP Fuel Service), Clean and Inspect \n\n D-005 Tanks (Ballast), Clean and Inspect \n\n D-006 Grey Water Holding Tank(s) and Lift Stations, Clean and Inspect \n\n D-007 Sewage Holding Tank(s), Clean and Inspect \n\n D-008 Sewage Piping, Clean, Flush and Pipe Repair \n\n D-009 Talon Grid (Type 18-08), Inspect and Test \n\n D-010 Fire Detection System Inspect and Test \n\n D-011 Tenting (Fore Deck), Provide \n\n D-012 Deck Covering (Slip-Resistant) Fore Deck, Renew \n\n D-013 Deck Covering (Polymeric), Renew \n\n D-014 Deck Covering (Polymeric), Repair and Seal \n\n D-015 Decks, Full Preservation \n\n D-016 Dry Provision Storeroom, Modify \n\n D-017 Fire Prevention, Provide \n\n D-018 Temporary Services, Provide \n\n Amendment 0001: the following questions were received in response to this solicitation. A revised Specification file is added to the files. The three (3) questions and responses received are: \n\n Item 18, Table 1 has both “Storage – General” and “Dry Stores” selected for KTR to provide. Does USG intend for KTR to provide a storage facility for each of these Table 1-line items, or only one storage facility that satisfies SFLC Std Spec 8635 para 3.3.14.5 and Table 7 (Dry Stores)? KTR may use one facility that satisfies those requirements for Storage – General and Dry Stores in 8635 para 3.3.14.5 Table 7. \n\n D-008: Specification references chemical SDS’s in 3.3 but does not require chemical cleaning. Historically due to system design, mechanically cleaning is not sufficient to clean this system. Is mechanically cleaning an option or will chemical cleaning be required (KTR recommends)? The intent is to require chemical cleaning. We worded the spec that way because we couldn’t require a specific product, but rather a type/quality of product, hence “Rydlyme or equivalent.” It was an oversight to not specify it must be chemical cleaning. \n\n D-018: Should contractor plan to have temp services only for the duration of sewage pipe cleaning in D-008 or for complete duration of project due to unknown amount of affected piping repairs in para 3.7.2? KTR shall provide temp services for the time required to perform the following: \n\n \n\t Full sewage pipe cleaning \n\t Renewal of 14 known pipe sections in Table 1 (37 ft) \n \n\n CG acknowledges the unknown time required to repair the additional 50 feet of piping referenced in para 3.7.2, due to factors such as location, interferences, etc. KTR proposals shall include the cost of piping and fittings. Additional labor and time required for temp services may be subject to a CR following inspections IAW para 3.6 and 3.6.1, if additional repairs cannot be completed during the duration of repairs IAW base SOW. \n"}

Open original notice

Get tenders like this in one daily alert

Use this notice as context when Tenqual drafts your search scope and fit criteria.

Create free alert
USCGC WAESCHE FQ3 FY26 Dock Side (DS) tender | Tenqual