Z1DA--36C242-26-AP-0767 | 528-26-1-8386-0003 528A8-22-851 Upgrade BMS Network Construction (VA-26-00016299)
- Country
- United States
- Published
- February 27, 2026
- Deadline
- February 27, 2026
Description
{"description":"FYI Submission from AE for 528A8-22-851 Upgrade VA Albany BMS Backbone\n\nThe project specs do not indicate a fiber type or strand count for new cabling, please clarify.\n\nResponse: \nSee attached spec section 27 15 00 COMMUNICATIONS STRUCTURED CABLING.\n\n2/1-DA-102: The drawings imply no ceiling, but the field condition is plaster and lathe. Please confirm if this is to be demolished.\n\nResponse:\nThe existing plaster and lathe ceiling shall remain. In spaces with plaster and lathe ceiling, install new conduits and devices below ceiling.\n\nDumbwaiter Vestibules: We suspect double ceilings, original plaster and lathe above the visible drop ceilings in these rooms. Please confirm if present.\n\nResponse: \nWhen Fellenzer was on-site we checked above the 6th and 9th floor ACT and found no plaster layer above those ceilings. Fellenzer did not check floors 2-5, 7-8, or 10.\n\nGiven the plaster and lathe in 2/1-DA-102 area and potentially above the vestibule drop ceilings, please advise if any testing has been performed for lead or asbestos.\nResponse: \nAssume plaster and lathe to have ACM and lead. Contractor shall include hazardous material testing and abatement in the bid price. If ACM is not found in certain areas, credit back to owner for abatement of those areas.\n"} Solicitation Number: 36C24226B0025 Type: Solicitation Base Type: Solicitation NAICS: 236220 Classification Code: Z1DA Response Deadline: 2026-02-27T13:00:00-05:00 Office Address: ALBANY, NY POC: Terry Fraser, terry.fraser@va.gov {"description":"FYI Submission from AE for 528A8-22-851 Upgrade VA Albany BMS Backbone\n\nThe project specs do not indicate a fiber type or strand count for new cabling, please clarify.\n\nResponse: \nSee attached spec section 27 15 00 COMMUNICATIONS STRUCTURED CABLING.\n\n2/1-DA-102: The drawings imply no ceiling, but the field condition is plaster and lathe. Please confirm if this is to be demolished.\n\nResponse:\nThe existing plaster and lathe ceiling shall remain. In spaces with plaster and lathe ceiling, install new conduits and devices below ceiling.\n\nDumbwaiter Vestibules: We suspect double ceilings, original plaster and lathe above the visible drop ceilings in these rooms. Please confirm if present.\n\nResponse: \nWhen Fellenzer was on-site we checked above the 6th and 9th floor ACT and found no plaster layer above those ceilings. Fellenzer did not check floors 2-5, 7-8, or 10.\n\nGiven the plaster and lathe in 2/1-DA-102 area and potentially above the vestibule drop ceilings, please advise if any testing has been performed for lead or asbestos.\nResponse: \nAssume plaster and lathe to have ACM and lead. Contractor shall include hazardous material testing and abatement in the bid price. If ACM is not found in certain areas, credit back to owner for abatement of those areas.\n"}
Get tenders like this in one daily alert
Use this notice as context when Tenqual drafts your search scope and fit criteria.