63100PR260007463 SCBA Bottles
- Country
- United States
- Published
- January 16, 2026
- Deadline
- January 22, 2026
Description
{"description":" \n\t \n\t \n\t\t OBJECTIVE \n\t \n\t \n \n\n The main objective for this statement of work is to have the 33 cylinders that have reached the end-of-life service requirements replaced with matching configurations of the G1 fire responder packs. These cylinders are required to support the above TPO’s in firefighting. These specifications match the current cylinders in use and will provide the needed on-air rating and dove tail configuration as specified per SFLC Engineering Advisory 002-25 , Maintenance Procedure Card R-Q-17849, and Naval Ships Technical Manual 077, Personal Protective Equipment . \n\n \n\n 2.0 SPECIFIC REQUIREMENTS/TASKS \n\n \n\n 2.1 Contractor will supply thirty-three (33) G1 low profile cylinders with the dove tail configuration and rated at 4,500 PSI. \n\n \n\n 2.2 FOB Destination: Contractor will be responsible for freight transportation to TRAINING CENTER YORKTOWN (TCY). \n"} Solicitation Number: 63100PR260007463 Type: Solicitation Base Type: Solicitation NAICS: 339113 Classification Code: 6515 Response Deadline: 2026-01-22T11:00:00-05:00 Office Address: YORKTOWN, VA Place of Performance: Yorktown, Virginia, 23690 POC: SKC Musselwhite, wayne.a.musselwhite@uscg.mil {"description":" \n\t \n\t \n\t\t OBJECTIVE \n\t \n\t \n \n\n The main objective for this statement of work is to have the 33 cylinders that have reached the end-of-life service requirements replaced with matching configurations of the G1 fire responder packs. These cylinders are required to support the above TPO’s in firefighting. These specifications match the current cylinders in use and will provide the needed on-air rating and dove tail configuration as specified per SFLC Engineering Advisory 002-25 , Maintenance Procedure Card R-Q-17849, and Naval Ships Technical Manual 077, Personal Protective Equipment . \n\n \n\n 2.0 SPECIFIC REQUIREMENTS/TASKS \n\n \n\n 2.1 Contractor will supply thirty-three (33) G1 low profile cylinders with the dove tail configuration and rated at 4,500 PSI. \n\n \n\n 2.2 FOB Destination: Contractor will be responsible for freight transportation to TRAINING CENTER YORKTOWN (TCY). \n"}
Get tenders like this in one daily alert
Use this notice as context when Tenqual drafts your search scope and fit criteria.