Building 504 Electrical Outlets
DEPT OF DEFENSE.DEPT OF THE AIR FORCE.AIR EDUCATION AND TRAINING COMMAND.FA3099 47 CONF CC
The contractor is responsible for delivering all materials, labor, tools, equipment, transportation, and supervision required to complete the installation in a single phase to minimize facility downtime. All design and construction must comply with Laughlin AFB Division 01 Spe...
Deadline Jul 14, 2026