TED
Provision of New Separated Surface water and waste water pipework and associated Inspection chambers
The Installation of New surface water drainage and inspection chambers in order to separate the storm runoff from the wastewater treatment plant. Installation of a new section of waste water pipework and connection to existing. Section of new surface water pipework along public r