In 2022, a Financial Agreement was signed between the EIB and the Ministry of Finance of Republic of North Macedonia for the implementation of the project “MUNICIPAL WATER INFRASTRUCTURE NORTH MACEDONIA” for the construction and rehabilitation of water supply and sewerage systems
With this supply is going to extend the measuring points in municipalities where the measuring with the referent monitoring equipment for ambient air quality is not existing for better information of the public about the air quality. 1 (one) Automatic monitoring stations for meas
The project provides for the regulation of the riverbed of Suva Reka within the territory of the Municipality of Saraj, covering a total length of 11,767.00 meters. The regulated section extends from the junction where the road to the village of Bojane branches off from the regio
According to the Waste Management Plan of the Republic of North Macedonia 2021–2031, about 112,000 tons of packaging waste were generated in the country in 2023, which equals around 60 kg of packaging waste per capita. In municipalities with up to 11,000 inhabitants, about 660 to
TED
The project provides for the regulation of the riverbed of Suva Reka within the territory of the Municipality of Saraj, covering a total length of 11,767.00 meters. The regulated section extends from the junction where the road to the village of Bojane branches off from the regio
TED
- Supply of electricity for the Ministry of Environment and Physical Planning; - Supply of electricity for the state automatic ambient Air Quality Monitoring System; - Supply of electricity for the Gjavato Hydrosystem in the Dojran Lake; - Supply of electricity for the Central En