In general, the Works comprise the replacing of 4no. separate parts of the existing single storey flat roofed sections of the school building. Overall Roof Area is 650m2. New single ply polymeric roof covering is to be laid on tapered and flat roofing boards fixed over existing r
The Supply of Network Equipment and Support and Maintenance of Existing Fixed and Wireless Network Infrastructure for LWETB. LWETB invites responses to this Call for Tender (CFT) from economic operators for The Supply of Network Equipment and Support and Maintenance of Existing F
LWETB wish to award a contract to supplier(s) for the multi-party framework agreement for Supply and Delivery of Construction Studies / DCG / Architectural Technology Supplies and Class Materials for Longford and Westmeath Education and Training Board (LWETB). Contracts are award
LWETB wish to award a contract to supplier(s) for the multi-party framework agreement for The Supply and Delivery of Science Supplies and Class Materials for Longford and Westmeath Education and Training Board (LWETB). Contracts are awarded under the Framework Agreement by Reques
LWETB wish to award a contract to supplier(s) for the multi-party framework agreement for The Supply and Delivery of Arts and Crafts Supplies and Class Materials for Longford and Westmeath Education and Training Board (LWETB). Contracts are awarded under the Framework Agreement b
LWETB wish to award a contract to supplier(s) for the multi-party framework agreement for The Supply and Delivery of Stationery, Office Supplies and Class Materials for Longford and Westmeath Education and Training Board (LWETB). Contracts are awarded under the Framework Agreemen
The Contractor will deliver the full design and coordination package for this works-contract, including all necessary drawings (fabrication, installation, coordinated working, builder’s work, record drawings) and electrical wiring diagrams showing equipment interconnections. They
TED
The project involves the following scope of works Disconnect and remove existing dust extraction system and associated ductwork and controls from constructions studies room and install a new dust extraction system and associated ductwork and controls. Complete modifications to ex
TED
The project involves the following scope of works: Disconnect and remove existing dust extraction system and associated ductwork and controls from constructions studies room and install a new dust extraction system and associated ductwork and controls. Complete modifications to e
TED
The Longford/Westmeath Biomass Project is a part of the Pathfinder 2025 Programme which will target CO2 emission reduction and will assist the Department of Education and Youth to explore options and test various solutions. This bundle, representing a single tender competition, w
TED
The Longford/Westmeath Biomass Project is a part of the Pathfinder 2025 Programme which will target CO2 emission reduction and will assist the Department of Education and Youth to explore options and test various solutions. Prior to the commencement of Biomass Project the success