City of MontereyPublished 20 May 2026Closes 30 Jun 2026 The work, in general, consists of sanitary sewer CCTV video inspection and cleaning. The work shall include, but not be limited to, closed-circuit televising and light cleaning not to exceed 50 miles of sanitary sewer. Heavy cleaning and root removal will be included on an as nee
City of MontereyPublished 12 May 2026Closes 28 May 2026 This is a job order contract, which shall be used to provide the City with a readily available work force for asbestos and lead abatement, as the City deems appropriate. In general, the work consists of, but is not limited to, providing all labor, materials, equipment, and projec
City of MontereyPublished 12 May 2026Closes 28 May 2026 This is a job order contract, which shall be used to provide the City with a readily available work force for asbestos and lead abatement, as the City deems appropriate. In general, the work consists of, but is not limited to, providing all labor, materials, equipment, and projec
City of MontereyPublished 5 May 2026Closes 2 Jun 2026 This is a job order contract, which shall be used to provide the City with a readily available workforce for repairs, alterations to existing facilities, emergency repairs and new construction, as the City deems appropriate. In general, the work consists of repair, alteration, re
City of MontereyPublished 4 May 2026Closes 2 Jun 2026 In general, the work consists of, but is not limited to, demolition and construction of concrete curb, gutter, cross gutter, sidewalk, curb ramps and driveways, storm drainage, signage and striping, and hot mix asphalt pavement.
City of MontereyPublished 29 Apr 2026Closes 2 Jun 2026 In general, the work consists of, but is not limited to, procuring and installing the 3 dual level 2 (Autel MaxiCharger) and 1 dual level 3 (BTC Power Gen4) EV chargers. Including any required demolition, trench excavation, trench restoration, installation of conduits, wiring, an
City of MontereyPublished 28 Apr 2026Closes 26 May 2026 In general, the work consists of, but is not limited to, setting the required storm water BMP and traffic control requirements to safely construct the proposed surface mounted HMA (Type A) Central Island. This includes adjusting any City structures to grade, City Posts, Orca type
City of MontereyPublished 24 Apr 2026Closes 29 May 2026 The City desires to obtain the services of outside firms or individuals to provide a full range of architectural professional services including, but not limited to architectural design work for building remodels and improvements including, but not limited to renovations required
City of MontereyPublished 8 Apr 2026Closes 5 May 2026 The work, in general, consists of road surface repair. The work shall include, but not be limited to, 6” depth pavement spot repairs, 3’ grind and asphalt overlay, crack sealing, placing polymer-modified asphalt emulsion (microsurfacing), associated striping removal and placement