Terminal 3 West Modernization - TP 246 - East: Sitework and Site Utilities

San Francisco Airport (Construction)United States

Purchaser

San Francisco Airport (Construction)

Country

United States

Notice published

13 Jul 2026

Tenqual indexed

14 Jul 2026

Closing date

11 Aug 2026

Source ID

Docs found

Track tenders like this

Save this notice and create a free tender alert for similar public opportunities.

Tender documents

Source documents portal identified

Create a free tender alert, then continue to the source documents portal on procurement.opengov.com.

  • Create one free tender alert.
  • See a short explanation of why each tender matches.
  • Upgrade later when you want help planning and writing the bid.

Tender summary

Design-Builder Firm Name: Turner Construction Company Project Overview: Terminal 3 West Modernization The goal of this project is to expand Terminal 3 by approximately 735,000 gross square feet and to renovate approximately 516,644 gross square feet of the existing facility. The terminal will remain in operation throughout the project and will require extensive phasing. This will include upgrading building systems, seismic retrofit, improving passenger flow, enhancing the passenger experience, and new gates to maximize flexibility. Courtyard 4 Connector (C4C) The Courtyard 4 Connector (C4C) Project is a new 7-story core-and-shell building, part of the overall Terminal 3 West (T3W) Modernization Project. The T3W Project is a continuation of the Terminal 3 (T3) Program at San Francisco International Airport (SFO), which began with renovations and expansions of Boarding Area E (BAE) and Terminal 3 East (T3E). The T3W Project will renovate the western half of Terminal 3 to the same level of passenger experience that was achieved in the other airport terminal projects. The Courtyard 4 Connector Building will be built between Terminal 3 and the International Terminal (ITB) and will include secure passenger corridors and baggage handling systems connecting T3 and ITB. Additionally, the project will consist of space for o&ices, assembly (passenger lounges), airport employee amenity space, Customs & Border Protection (CBP) One-Stop passenger security screening checkpoint, loading dock, rooftop mechanical penthouse, and mechanical system upgrades within the existing pump station. Level 1 of C4C is open to the airfield and apron program while levels 2 and 3 are directly connected to T3 and are considered as an extension of that building for egress and plumbing fixture provisions. Trade Package No.: 246 Trade Package Title: East: Sitework and Site Utilities Description of the Trade Package Scope of Work: This trade package includes sitework and site utility improvements within the east portion of the project area. The scope includes grading, excavation, trenching, backfill, paving, concrete flatwork, drainage improvements, and installation or modification of underground utilities, including coordination, testing, inspections, and restoration of disturbed areas. Trade Package Bid Due Date and Time: 8/10/2026 by 5:00PM Estimated Cost: $16.1 M Main Trades of the Trade Package: Sitework, Site Utilities CMD LBE Participation Requirements % : 25% Design-Builder requirements or prequalification criteria: Please reach out to Briana Padilla at brpadilla@tcco.com for SFO and Turner prequalification criteria for this package. Contact for Trade Package information: Briana Padilla email: brpadilla@tcco.com

What to check before bidding

  • Issued by San Francisco Airport (Construction).
  • Located in United States.
  • Source notice sfoconstruction:10071.76 - TP 246 on US OpenGov.
  • Notice published 13 Jul 2026; Tenqual indexed it 14 Jul 2026.
  • Deadline listed as 11 Aug 2026.
  • Source documents portal identified.