Purchaser
Statens vegvesen
Country
Norway
Notice published
25 Jun 2026
Tenqual indexed
25 Jun 2026
Closing date
14 Aug 2026
Source ID
Docs found
—
Save this notice and create a free tender alert for similar public opportunities.
- Create one free tender alert.
- See a short explanation of why each tender matches.
- Upgrade later when you want help planning and writing the bid.
Tender summary
The Norwegian Public Roads Administration Operations and Maintenance invites tenderers to a competition for the following contract work: Framework agreement for tunnel and rock protection for Trøndelag, Møre og Romsdal. The contract includes cleaning and bolting protection, establishing of new and improving existing water and frost protection in tunnels, clearing and bolt protection in cuttings, establishing different types of meshes (ice nets, erosion network etc.), improvements and establishment of new security measures in the open air on European and national roads. in Trøndelag, Møre og Romsdal. The measures will vary in extent. Outside of general processes, a couple of concrete projects are described to be carried out: TR01: E6 Kvam – clearing and work protection cutting. Modification of the existing network TR02: E6 Cleansed - clearing and work securing cutting. Assembly of an ice network. TR03: E39 Søvassdalen - clearing and work securing cutting. Assembly of an ice network. MR01:E39 Brusdalen – clearing and work securing cutting. MR03: E136 Sørnes tunnel – Rensk and securing, establishment of a new water-frost protection vault. Consideration shall be given to set timetables for public transport. Routines must be established. for emergency emergency services. All traffic deviations/driving vehicles in tunnels shall be carried out for work. passing must be clarified by the traffic conductor with work teams in the tunnel before emergency services are released. through. There will be a lot of focus on the contract work notification as the work is ongoing on the existing road network. The location of the traffic conductor shall always be risk assessed in the contractor ́s work warning plan. The contracting authority would like parallel framework agreements with up to 3 contractors per area, based on which tender is best in accordance with the award criteria.
What to check before bidding
- Issued by Statens vegvesen.
- Located in Norway.
- Source notice 433208-2026 on TED.
- Notice published 25 Jun 2026; Tenqual indexed it 25 Jun 2026.
- Deadline listed as 14 Aug 2026.
- Create a free tender alert to catch similar opportunities before the deadline pressure starts.