Tenqual homeBrowse public tender search
US-GA Procurement Registry

SB001-27 Demolition of 225 Langley Drive

Lawrenceville, City OfUnited States

Purchaser

Lawrenceville, City Of

Country

United States

Notice published

18 Jun 2026

Tenqual indexed

19 Jun 2026

Closing date

30 Jul 2026

Source ID

Docs found

Track tenders like this

Save this notice and create a free tender alert for similar public opportunities.

Tender documents

Source documents portal identified

Create a free tender alert, then continue to the source documents portal on ssl.doas.state.ga.us.

  • Create one free tender alert.
  • See a short explanation of why each tender matches.
  • Upgrade later when you want help planning and writing the bid.

Tender summary

The work to be performed by the Contractor consists of but is not limited to the following major items: 1. Secure the perimeter following International Building Code. Install erosion control measurements around jobsite including protection of stormwater intlets at all times. 2. All building structures and site features, including but not limited to floor slabs, drains, lifts, concrete sidewalks/footpaths, septic tanks (if any), debris, drums, containers, used aboveground storage tanks (ASTs), signs, junk, trash, the convenience store building, underground storage tanks (USTs), fueling canopy, fuel dispenser islands, dumpster enclosure and pads, grease trap, utility appurtenances, foundations, underground structures, trees, shrubs, and any other abandoned site features located inside or outside the main building area, shall be completely demolished and removed from the site. The existing concrete parking lot shall be demolished and removed, with the exception of the existing concrete entrance/driveway apron, which shall remain in place. (Refer to the site plan for the limits of demolition). 3. Disturbed area must be graded, backfilled & compacted, sloped in such a manner that the site does not retain water (around 1% grade). Seed and Straw must be applied after site disturbance. (Refer to site plan) 4. Once demolition is completed, Contractor should place concrete bin blocks at driveways. 5. All demolition debris must be removed and disposed of properly in an appropriate landfill or recycled in accordance with the provisions of the Georgia Comprehensive Solid Waste Management Act of 1990 and the Georgia Rules for Solid Waste Management Chapter 391-3-4. 6. See additional information in the Site Plan and Phase I Environmental Assessment report.

What to check before bidding

  • Issued by Lawrenceville, City Of.
  • Located in United States.
  • Source notice PE-66751-NONST-2027-000000097 on US-GA Procurement Registry.
  • Notice published 18 Jun 2026; Tenqual indexed it 19 Jun 2026.
  • Deadline listed as 30 Jul 2026.
  • Source documents portal identified.
  • Create a free tender alert to catch similar opportunities before the deadline pressure starts.