Harbor Boulevard Rehabilitation from Chapman Avenue to Convention Way; Placentia Avenue Rehabilitation from State College Boulevard to the 91 freeway, and Miraloma Vicinity Rehabilitation
Purchaser
The City of Anaheim
Country
United States
Notice published
4 Jun 2026
Tenqual indexed
5 Jun 2026
Closing date
25 Jun 2026
Source ID
Docs found
Save this notice and create a free tender alert for similar public opportunities.
Source documents portal identified
Create a free tender alert, then continue to the source documents portal on procurement.opengov.com.
- Create one free tender alert.
- See a short explanation of why each tender matches.
- Upgrade later when you want help planning and writing the bid.
Tender summary
The work to be undertaken generally consists of rehabilitating the roadway by removing and reconstructing the asphalt concrete pavement within the existing right of way with rubberized asphalt concrete pavement; crack sealing; the removal and reconstruction of ADA access ramps, driveway approaches, curb, curb and gutter, local depressions, sidewalk; replacement and adjustment of utility structures and pull-boxes; replacement of traffic detection devices, striping, signage, pavement markings, and all appurtenant work thereto necessary for the proper construction of the proposed improvements in accordance with the Project's Plans and Specifications. This project is covered "Project Work" as defined in the Second Amended and Restated Community Workforce Agreement (CWA) the City entered into with the Los Angeles/Orange Counties Building and Construction Trades Council in the Signatory Craft Councils and Local Unions. Therefore, the awarded contractor and its subcontractors of all tiers shall agree to be party to and bound by the CWA by signing a Letter of Assent (a form attached to the CWA as Attachment A). The CWA will be incorporated by reference in the Construction Contract and can be accessed at the City's website at: http://anaheim.net/229/Public-Works 10% bid bond is required. Required License Classifications: Prime contractor: General Engineering (A), Class C-10 for traffic signal subcontractors and for street light subcontractors, Class C-34 or A for water work subcontractors, and electrical subcontractor performing APU Communication vault adjustment shall be from the City of Anaheim Master Agreement Electrical Contractors Transmission and Distribution 2021-2026 List. DIR Registration is required for prime and subcontractors. For the purposes of bid evaluations and fairness to all bidders, the City will evaluate the Total Base Bid Proposal. The lowest responsive responsible Base Bid bidder will be selected. Work under the Alternative Bid (if any) may be authorized, if it is determined at the sole discretion of the City, that work under the Alternative Bid is within the City's available budget. All bidders shall further understand that the City reserves the right to reject all bids. All Bids shall be in accordance with the "Invitation to Bidders" and "Instructions to Bidders". No contractor or subcontractor may be listed on a bid proposal for a Public Works project(submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)].No contractor or subcontractor may be awarded a contract for Public Work on a Public Works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5.This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.
What to check before bidding
- Issued by The City of Anaheim.
- Located in United States.
- Source notice anaheim:RCP2025-23096, RCP2025-23097, RCP2025-23098 on US OpenGov.
- Notice published 4 Jun 2026; Tenqual indexed it 5 Jun 2026.
- Deadline listed as 25 Jun 2026.
- Source documents portal identified.
- Create a free tender alert to catch similar opportunities before the deadline pressure starts.