Purchaser
City of South Daytona, FL
Country
United States
Notice published
3 Jun 2026
Tenqual indexed
4 Jun 2026
Closing date
26 Jun 2026
Source ID
Docs found
Save this notice and create a free tender alert for similar public opportunities.
Source documents portal identified
Create a free tender alert, then continue to the source documents portal on procurement.opengov.com.
- Create one free tender alert.
- See a short explanation of why each tender matches.
- Upgrade later when you want help planning and writing the bid.
Tender summary
The City of South Daytona, FL is soliciting bids for Project Title . Sealed paper bids will be accepted in the City Manager’s Office, City Hall, located at 1672 S. Ridgewood Avenue, South Daytona, Florida 32119. Bids will be submitted electronically via the City's e-Procurement Portal at https://procurement.opengov.com/portal/southdaytona . Bids will be accepted until Response Submission Time on Response Submission Date . Project work includes furnishing, delivering, and ensuring the operational readiness of one (1) 48-inch backflow preventer for a 48-inch reinforced concrete pipe (RCP) stormwater system to prevent reverse flow and tidal or flood intrusion. The backflow preventer shall be specifically designed for stormwater applications and sized to fit a 48-inch RCP, providing a watertight seal under reverse flow conditions while allowing unrestricted discharge during normal operations. The assembly shall be constructed of durable, corrosion-resistant materials suitable for continuous exposure to stormwater and environmental conditions, and shall be capable of withstanding anticipated hydraulic loads, debris impact, and long-term submergence.
What to check before bidding
- Issued by City of South Daytona, FL.
- Located in United States.
- Source notice southdaytona:26-ITB-010 on US OpenGov.
- Notice published 3 Jun 2026; Tenqual indexed it 4 Jun 2026.
- Deadline listed as 26 Jun 2026.
- Source documents portal identified.
- Create a free tender alert to catch similar opportunities before the deadline pressure starts.