Hokitika Airport Resilience Project (HARP) – Airfield Ground Lighting
Purchaser
Westland District Council
Country
New Zealand
Published
29 May 2026
Closing date
11 Jun 2026
Source ID
Docs found
—
Save this notice and create a tender alert for similar public opportunities.
- Create one free tender alert.
- See a short explanation of why each tender matches.
- Upgrade later when you want help planning and writing the bid.
Tender summary
What we need This ROI is issued by Westland District Council, referred to below as “WDC”, “we” or “us”. The Hokitika Airport Resilience Project (HARP) aims to increase the overall resilience of the airport by improving the airports’ ability to support regional airline aircraft at higher weights and passenger loadings in a wider range of weather conditions and during and post major natural hazard events – such as the effects of the anticipated Alpine Fault rupture (AF8). In doing this, WDC hopes to improve and protect the runways assets, including the Aeronautical Ground Lighting (AGL) system and be in a position to provide AGL services without the need for Grid tied or Generator supported AGL systems. What’s important to us? • Local presence in New Zealand - Including the ability to respond within 24hrs for servicing. • Flexibility of installation and maintenance - Being somewhat isolated on the West Coast, means a level of self-adjustment and maintenance being able to be completed by Airport Staff will be of benefit. • Resilience – The core purpose of HARP is to improve resilience of the Airport, we want assurance that in the event of natural disasters and other events, the Airport’s AGL system will be protected and continue to function without dependence of network systems. • We have a preference for a solar system to be proposed over cabled AGL, but welcome proposals for all systems.
What to check before bidding
- Issued by Westland District Council.
- Located in New Zealand.
- Deadline listed as 11 Jun 2026.
- Create a free tender alert to catch similar opportunities before the deadline pressure starts.