Wilkinson Hall New Boiler Room at Southern CT State University, New Haven
Purchaser
CT State Colleges & Universities
Country
United States
Published
14 May 2026
Closing date
23 Jun 2026
Source ID
Docs found
Save this notice and create a tender alert for similar public opportunities.
Source documents portal identified
Create a free account to continue to the source documents portal on webprocure.proactiscloud.com.
- Create one free tender alert.
- See a short explanation of why each tender matches.
- Upgrade later when you want help planning and writing the bid.
Summary
Removal of existing heating & hot water heat exchanger, glycol heat exchanger & pump, domestic water heating mixing valve & circulator, modifications to the gas service & piping into the building. Removal & capping of the campus high temperature hot water piping at the penetration into the room (piping is deenergized). Turn over existing ACE water heater to SCSU. New construction includes rigging, installation of two owner provided AERCO boilers & all accessories, venting, piping, pumps, controls & wiring associated with hot water system , glycol heat exchanger & pumps, 2 indirect domestic water heaters, mixing valves & circulator, backflow prevention device on incoming water service, and electrical power to support the equipment including a new panel. DDC system integration w/existing BMS system serving the building/campus.
Sign in to run AI fit scoring, bid/no bid reviews, and compliance drafting for this tender.