Tenqual homeBrowse public tender search
US-GA Procurement Registry

26-010 SCADA System Equipment Upgrade for Water System

Flowery Branch, City OfUnited States

Purchaser

Flowery Branch, City Of

Country

United States

Published

13 May 2026

Closing date

30 Jun 2026

Source ID

Docs found

Create a free account to save this tender

Save this notice and create a tender alert for similar public opportunities.

Tender documents

Source documents portal identified

Create a free account to continue to the source documents portal on ssl.doas.state.ga.us.

  • Create one free tender alert.
  • See a short explanation of why each tender matches.
  • Upgrade later when you want help planning and writing the bid.

Tender summary

The City of Flowery Branch is soliciting proposals from qualified Supervisory Control and Data Acquisition (SCADA) Integrators to provide both ongoing/as-needed SCADA maintenance and advisory services, and to perform capital improvements on/for the City¿s existing SCADA system. The project includes the City¿s SCADA monitoring and control system at one (1) office location, with Remote Telemetry Units (RTUs) at one (1) booster pump station, two (2) elevated tank sites, and one (1) well house site. The selected Integrator will be required to coordinate all SCADA system design, installation, and configuration with the City¿s Information Technology (IT) Department to ensure network security, proper firewall configuration, and secure remote access in accordance with industry cybersecurity best practices. This project will be funded through the Georgia Environmental Finance Authority (GEFA), and all applicable State and Federal requirements will apply. Respondents must review and adhere to all GEFA-related special conditions and supplemental requirements.

What to check before bidding

  • Issued by Flowery Branch, City Of.
  • Located in United States.
  • Deadline listed as 30 Jun 2026.
  • Source documents portal identified.
  • Create a free tender alert to catch similar opportunities before the deadline pressure starts.