Tenqual homeBrowse public tender search
US OpenGov

Jay Lively Ice Chiller Replacement Project

City of Flagstaff, AZUnited States

Purchaser

City of Flagstaff, AZ

Country

United States

Published

12 May 2026

Closing date

12 Jun 2026

Source ID

Docs found

Create a free account to save this tender

Save this notice and create a tender alert for similar public opportunities.

Tender documents

Source documents portal identified

Create a free account to continue to the source documents portal on procurement.opengov.com.

  • Create one free tender alert.
  • See a short explanation of why each tender matches.
  • Upgrade later when you want help planning and writing the bid.

Summary

The project is located at the Jay Lively Activity Center in Flagstaff, AZ. The scope of work includes selective demolition of existing water-cooled chillers, evaporative coolers, pumps, air control devices, and piping, and the installation of two new air-cooled chillers, primary chilled water pumps, air control devices, and a hydronic reheat loop. New equipment shall be connected to existing chilled water piping. The new reheat loop shall be connected to the existing heat exchanger HX-2. New controls devices, wiring, and programming shall be provided to integrate all new equipment into the existing BAS system. New chillers shall have BACnet communication. A new 1000 amp main electrical switchboard will be provided by the owner and installed by the contractor to feed the building. An electrical service upgrade will be required to support the new equipment. The City of Flagstaff will coordinate all requirements with the local utility to implement the service upgrade.

Sign in to run AI fit scoring, bid/no bid reviews, and compliance drafting for this tender.

Jay Lively Ice Chiller Replacement Project | Tenqual Tender