Purchaser
City of Flagstaff, AZ
Country
United States
Published
12 May 2026
Closing date
12 Jun 2026
Source ID
Docs found
Save this notice and create a tender alert for similar public opportunities.
Source documents portal identified
Create a free account to continue to the source documents portal on procurement.opengov.com.
- Create one free tender alert.
- See a short explanation of why each tender matches.
- Upgrade later when you want help planning and writing the bid.
Summary
The project is located at the Jay Lively Activity Center in Flagstaff, AZ. The scope of work includes selective demolition of existing water-cooled chillers, evaporative coolers, pumps, air control devices, and piping, and the installation of two new air-cooled chillers, primary chilled water pumps, air control devices, and a hydronic reheat loop. New equipment shall be connected to existing chilled water piping. The new reheat loop shall be connected to the existing heat exchanger HX-2. New controls devices, wiring, and programming shall be provided to integrate all new equipment into the existing BAS system. New chillers shall have BACnet communication. A new 1000 amp main electrical switchboard will be provided by the owner and installed by the contractor to feed the building. An electrical service upgrade will be required to support the new equipment. The City of Flagstaff will coordinate all requirements with the local utility to implement the service upgrade.
Sign in to run AI fit scoring, bid/no bid reviews, and compliance drafting for this tender.