Tenqual homeBrowse public tender search
SAM.gov

B-2 Supply Chain Velocity Initiative

Unknown purchaserUnited States

Purchaser

Country

United States

Notice published

6 May 2026

Tenqual indexed

7 May 2026

Closing date

11 May 2026

Source ID

Docs found

Create a free account to save this tender

Save this notice and create a tender alert for similar public opportunities.

  • Create one free tender alert.
  • See a short explanation of why each tender matches.
  • Upgrade later when you want help planning and writing the bid.

Tender summary

The Air Force Life Cycle Management Center (AFLCMC) is conducting market research to identify sources capable of serving as a neutral, program-controlled integrator to address parts obsolescence and regenerate the B-2 Spirit bomber supply chain through reverse engineering and technical data package (TDP) development. Viable respondents must be established defense contractors possessing demonstrated integration experience for low-density strategic aircraft fleets, extensive in-house reverse engineering expertise, and specialized SAP-cleared facilities capable of accommodating multiple large-body aircraft. Due to inherent Organizational Conflicts of Interest (OCI) with this specific effort, the B-2 Original Equipment Manufacturers (OEMs) and their primary mission-system affiliates shall not be considered for award and should NOT respond to this notice. Potential vendors should review the attached document and submit a capability statement if, and only if, they possess verifiable evidence of meeting every mandatory qualification and the infrastructure requirements outlined in the synopsis.

What to check before bidding

  • Located in United States.
  • Source notice 515111ee86054640b5f2941969a2cbea on SAM.gov.
  • Notice published 6 May 2026; Tenqual indexed it 7 May 2026.
  • Deadline listed as 11 May 2026.
  • Create a free tender alert to catch similar opportunities before the deadline pressure starts.