Purchaser
Tampa International Airport
Country
United States
Notice published
14 Apr 2026
Tenqual indexed
30 Apr 2026
Closing date
21 May 2026
Source ID
Docs found
Save this notice and create a tender alert for similar public opportunities.
Source documents portal identified
Create a free account to continue to the source documents portal on procurement.opengov.com.
- Create one free tender alert.
- See a short explanation of why each tender matches.
- Upgrade later when you want help planning and writing the bid.
Tender summary
This Project will rehabilitate the existing seawall on the east side of the airfield at Peter O. Knight Airport. This project consists of: Pipe Repairs Repairs to the seven (7) existing outfall pipes within the alignment, including pipe section and headwall replacements. Washouts Backfill with earth and flowable fill of approximately forty-eight (48) washout locations identified to date. Major and Minor Seawall Failure In the areas where there are seawall failures and cracks that expose rebar to the environmental elements, cleaning and applying corrosion inhibitors to the exposed reinforcement, saw cutting and removal of concrete in the adjoining areas, and tie-back supports as necessary. Backfill and recompact existing voids, install sheet pilings, and install a new concrete cap and tie-back. Seawall Spall Repair The recommended repair of the spalling is to route and clean the crack, then fill the void with trowel-applied mortar.
What to check before bidding
- Issued by Tampa International Airport.
- Located in United States.
- Source notice tampaairport:7555 26 on US OpenGov.
- Notice published 14 Apr 2026; Tenqual indexed it 30 Apr 2026.
- Deadline listed as 21 May 2026.
- Source documents portal identified.
- Create a free tender alert to catch similar opportunities before the deadline pressure starts.