Trade Package - West Field Garage 675 - TP 10.05 - Metal Panel
Purchaser
San Francisco Airport (Construction)
Country
United States
Notice published
17 Apr 2026
Tenqual indexed
30 Apr 2026
Closing date
2 May 2026
Source ID
Docs found
Save this notice and create a tender alert for similar public opportunities.
Source documents portal identified
Create a free account to continue to the source documents portal on procurement.opengov.com.
- Create one free tender alert.
- See a short explanation of why each tender matches.
- Upgrade later when you want help planning and writing the bid.
Tender summary
Design-Builder Firm Name: Austin Webcor Joint Venture Project Overview: West Field Garage 675 is a new above-ground 7 stories parking structure at Site 670 adjacent to the 674 Administration building. The parking structure will provide between 1,100 to 1,200 parking spaces and will be built using a moment frame design. Trade Package No.: TP-10.05 Trade Package Title: Metal Panel Description of the Trade Package Scope of Work: Procure and install the garage's exterior skin, including ACM metal panels, Kinetic wall, and metal soffit ceiling; glass and glazing may also be added to this trade package. Trade Package Bid Due Date and Time : Pre-qualification due date: 2026.05.01. Estimated Cost: $6,000,000 Main Trades of the Trade Package: Metal Panel CMD LBE Participation Requirement : 0% Design-Builder requirements or prequalification criteria: In order to qualify for West Field Garage Project, you must also be pre-qualified with Webcor. If you have not yet pre-qualified with Webcor, please contact Candace Kong Kee at ckongkee@webcor.com . Pre-qualification due date is 2026.05.01, including both project pre-qual and Webcor pre-qual. For information on how to get RFQ/RFP with Austin Webcor Joint Venture for the West Field Garage 675 Project, please contact Stacey Li at sli@austin-ind.com. Contact for Trade Package information: Stacey Li at sli@austin-ind.com Reference: 11917.66 - TP-10.05 Department: Design-Builder Buyer: San Francisco Airport (Construction) State: CA Process: Trade Package Advertisement Closing date: 2026-05-02 Design-Builder Firm Name: Austin Webcor Joint Venture Project Overview: West Field Garage 675 is a new above-ground 7 stories parking structure at Site 670 adjacent to the 674 Administration building. The parking structure will provide between 1,100 to 1,200 parking spaces and will be built using a moment frame design. Trade Package No.: TP-10.05 Trade Package Title: Metal Panel Description of the Trade Package Scope of Work: Procure and install the garage's exterior skin, including ACM metal panels, Kinetic wall, and metal soffit ceiling; glass and glazing may also be added to this trade package. Trade Package Bid Due Date and Time : Pre-qualification due date: 2026.05.01. Estimated Cost: $6,000,000 Main Trades of the Trade Package: Metal Panel CMD LBE Participation Requirement : 0% Design-Builder requirements or prequalification criteria: In order to qualify for West Field Garage Project, you must also be pre-qualified with Webcor. If you have not yet pre-qualified with Webcor, please contact Candace Kong Kee at ckongkee@webcor.com . Pre-qualification due date is 2026.05.01, including both project pre-qual and Webcor pre-qual. For information on how to get RFQ/RFP with Austin Webcor Joint Venture for the West Field Garage 675 Project, please contact Stacey Li at sli@austin-ind.com. Contact for Trade Package information: Stacey Li at sli@austin-ind.com
What to check before bidding
- Issued by San Francisco Airport (Construction).
- Located in United States.
- Source notice sfoconstruction:11917.66 - TP-10.05 on US OpenGov.
- Notice published 17 Apr 2026; Tenqual indexed it 30 Apr 2026.
- Deadline listed as 2 May 2026.
- Source documents portal identified.
- Create a free tender alert to catch similar opportunities before the deadline pressure starts.