Purchaser
Palmdale Water District
Country
United States
Published
9 Apr 2026
Closing date
30 May 2026
Source ID
Docs found
Save this notice and create a tender alert for similar public opportunities.
Source documents portal identified
Create a free account to continue to the source documents portal on procurement.opengov.com.
- Create one free tender alert.
- See a short explanation of why each tender matches.
- Upgrade later when you want help planning and writing the bid.
Tender summary
The work to be performed under this Contract consists of furnishing all labor, equipment, materials, and forces necessary for the drilling, construction, development and testing of one (1) test well, designated TW-1, and one (1) monitoring well, designated MW-1, in support of the Palmdale Water District (PWD) Pure Water Antelope Valley (PWAV) project. The primary goal of the PWAV project is to develop a drought-resilient water supply for the Antelope Valley area through replenishment of the groundwater basin by injection of treated wastewater. The primary goal of the site characterization drilling program is to refine understanding of area aquifers from which an existing groundwater model can be validated and refined to confirm regulatory compliance. Among other things, this proposed program will include installation and testing of a deep test well and hydraulically downgradient monitoring well to better characterize the subsurface lithology and geochemistry, estimate potential full-scale injection capacity, and estimate aquifer transport properties.
What to check before bidding
- Issued by Palmdale Water District.
- Located in United States.
- Deadline listed as 30 May 2026.
- Source documents portal identified.
- Create a free tender alert to catch similar opportunities before the deadline pressure starts.