Construction Management At Risk (CMAR) Terminal Restroom Modernization and Other Improvements Project
Purchaser
Ontario International Airport
Country
United States
Notice published
17 Apr 2026
Tenqual indexed
30 Apr 2026
Closing date
20 May 2026
Source ID
Docs found
Save this notice and create a free tender alert for similar public opportunities.
Source documents portal identified
Create a free tender alert, then continue to the source documents portal on procurement.opengov.com.
- Create one free tender alert.
- See a short explanation of why each tender matches.
- Upgrade later when you want help planning and writing the bid.
Tender summary
The Authority seeks qualified firms (Proposers) to provide on-call design collaboration, design assist, preconstruction, and construction services as a Construction Manager at Risk (CMAR) for the Terminal Restroom Modernization and Other Improvement Projects (“Program”) at the Ontario International Airport (ONT). The Program includes both federally funded/eligible projects and non-federally funded/ineligible projects as specified in the Table 1‑1. Table 1‑1 – Program Funding Project Name Funding Terminal Restroom Modernization Project Federally Funded /Eligible Terminal Hold-Room Enhancement Project Non-Federal / Ineligible Other Projects Non-Federal /Ineligible The “Program” includes the following projects: Restroom Modernization Project Replace and upgrade aging facilities and equipment in the central public airside restrooms in Terminals 2 and 4 at ONT. Existing disabled access (ADA) stalls will be widened to comply with current ADA standards. Existing lighting, toilets, fixtures, and equipment will be removed and replaced with new energy-efficient LED lighting, water-efficient flush toilets, fixtures, and other equipment. The improvements will not change the existing number of stalls and fixtures in the restrooms. Prior to construction, temporary restrooms are to be constructed with approximately the same number of fixtures to ensure that the passenger level of service is maintained during construction. Hold-room Enhancements Project Modernize hold rooms in Terminals 2 and 4 at ONT. The existing seating will be removed and replaced with new seating, new gate podiums, modernized gate electrical and data infrastructure, new carpet, and new overhead lighting. The hold room seating and podium arrangements will be reorganized to improve passenger flow and line of sight to gates. New seats will be equipped with power outlets to improve passenger experience and level of service. Seating power will be plugged into new floor outlet infrastructure. Other Projects OIAA has identified the potential to add other future adjacent and/or similar improvement projects on an on-call basis. To assist Proposers in their submittal of this RFP, see below for a representative sample of the types of potential future projects. This list is not to be considered all inclusive. OIAA is not guaranteeing that any of the potential future projects will be approved. I. Other Improvement Projects a. Paging Systems Replacement b. Common Use Terminal Equipment (CUTE)/Common Use Passenger Process (CUPP) c. Concession & Office Space Build Out d. Other Terminal Improvement Projects Work on the Program will be executed within an active airport and terminal environment and is intended to support the Authority’s ongoing terminal improvement and passenger experience initiatives.
What to check before bidding
- Issued by Ontario International Airport.
- Located in United States.
- Source notice flyontario:2026-RFP-080 on US OpenGov.
- Notice published 17 Apr 2026; Tenqual indexed it 30 Apr 2026.
- Deadline listed as 20 May 2026.
- Source documents portal identified.
- Create a free tender alert to catch similar opportunities before the deadline pressure starts.