Request for Qualification (RFQ) for Construction Services at the City of Caldwell Wastewater Treatment Plant
Purchaser
City of Caldwell
Country
United States
Published
24 Apr 2026
Closing date
12 May 2026
Source ID
Docs found
Save this notice and create a tender alert for similar public opportunities.
Source documents portal identified
Create a free account to continue to the source documents portal on procurement.opengov.com.
- Create one free tender alert.
- See a short explanation of why each tender matches.
- Upgrade later when you want help planning and writing the bid.
Tender summary
GENERAL The City of Caldwell (Owner) seeks qualified contractors to submit Statements of Qualifications for construction of the Caldwell WWTP Filter Chemical Addition (Phase 1 and Phase 2) and Administrative Building Projects. This Request for Qualification (RFQ) has instructions for submittal requirements for prequalification statements, including the evaluation criteria. PURPOSE AND APPROACH The purpose of the prequalification process is to select those Contractors (General Contractors who will submit bids for the Work) that the Owner deems to be qualified and capable of completing the Projects in conformance with the Contract Documents. Parties submitting Statements of Qualifications in accordance with these documents will be notified whether or not they are selected for prequalification. Prequalified Contractors will be so identified in the Notice Inviting Bids for the construction phase of the Projects. PROJECT SCOPE 1. Construction of flash mix and flocculation improvements at the Caldwell WWTP Filter Building (WWTP Filter Chemical Addition – Phase 1). 2. Construction of chemical storage building for coagulant at the Caldwell WWTP Filter Building (WWTP Filter Chemical Addition – Phase 2). 3. Construction of new WWTP administrative building (WWTP Administrative Building). 4. Excavation to construct improvements; connections to site utilities; backfill and grading; construction of new access roads, site improvements and site restoration. 5. Construction of improvements, including structural, mechanical, HVAC, plumbing, electrical, and fire sprinkler systems. Selection as a prequalified Contractor does not imply Owner's acceptance or approval of the Contractor's specific personnel, equipment or methods, whether or not these items are described in the Contractor's prequalification statement. Statements of Qualification are to be received at the Caldwell Engineering Department located at Contact Address , no later than Response Submission Date , Response Submission Time local time. The City of Caldwell reserves the right to reject any and all Consultants, to waive any irregularities in the Statements of Qualification received, and to accept the Consultants for roster that are in the best interest of the City. All infrastructure designed will be constructed and owned by the City of Caldwell and will be required to meet all City of Caldwell and the current adopted version of the ISPWC
What to check before bidding
- Issued by City of Caldwell.
- Located in United States.
- Deadline listed as 12 May 2026.
- Source documents portal identified.
- Create a free tender alert to catch similar opportunities before the deadline pressure starts.