CROWN - FC5715-40 4,000 LB. CAPICITY, 4-WHEEL, Electric SIT-DOWN COUNTERBALANCE TRUCK
Purchaser
—
Country
United States
Notice published
24 Apr 2026
Tenqual indexed
26 Apr 2026
Closing date
1 May 2026
Source ID
Docs found
—
Save this notice and create a tender alert for similar public opportunities.
- Create one free tender alert.
- See a short explanation of why each tender matches.
- Upgrade later when you want help planning and writing the bid.
Tender summary
<p>This description summarizes the requirements for a high-performance, electric sit-down forklift and its supporting infrastructure to ensure a competitive and fair bidding process.</p> <p><strong>Equipment and Performance Specifications</strong></p> <ul> <li><strong>Vehicle Type:</strong> 4-wheel electric sit-down counterbalanced forklift with a minimum <strong>4,000 lb. lifting capacity</strong>.</li> <li><strong>Mast Assembly:</strong> Triple-stage mast with a maximum lift height of approximately <strong>188"</strong>, a collapsed height of <strong>83"</strong>, and a minimum free lift of <strong>32"</strong>.</li> <li><strong>Hydraulics and Attachment:</strong> <ul> <li>Integrated <strong>high-visibility sideshifting fork positioner</strong>.</li> <li>48" standard forks on a 38" wide carriage.</li> <li>Two-function auxiliary hydraulics (4-lever/spool) with internal carriage plumbing.</li> </ul> </li> <li><strong>Drivetrain and Steering:</strong> AC traction and hydraulic motors with on-demand electric steering and a specialized cooling package for high-demand (dock) performance.</li> <li><strong>Tires:</strong> Non-marking lugged cushion rubber tires on both drive and steer axles. </li> </ul> <p><strong>Power System and Charging</strong></p> <ul> <li><strong>Battery:</strong> 36V Lead Acid battery (min. 1100AH) equipped with a <strong>wireless battery monitoring system</strong> (e.g., WiiQ or equivalent) to track health and cycles.</li> <li><strong>Charger:</strong> High-efficiency, 3-phase high-frequency charger (208/240V) compatible with the specified battery and monitoring system.</li> <li><strong>Configuration:</strong> Lift-out battery removal with standard door retainers and safety cutoff switches.</li> </ul> <p><strong>Ergonomics and Safety</strong></p> <ul> <li><strong>Operator Compartment:</strong> Full-suspension vinyl seat with high-visibility orange seatbelt, integrated armrest with fingertip bionic controls, and dual square plastic mirrors.</li> <li><strong>Safety Features:</strong> Smart reverse travel alarm, forward and reverse blue floor spotlights, and LED front worklights mounted to the overhead guard.</li> <li><strong>Accessories:</strong> Includes an operator cooling fan and "Work Assist" storage bins/trays.</li> </ul> <p><strong>Fleet Management and Telematics</strong></p> <ul> <li><strong>System:</strong> Integrated fleet management hardware with a minimum <strong>7” touchscreen display</strong>.</li> <li><strong>Subscription:</strong> 60-month service contract for wireless monitoring, impact sensing, and operator checklists. The vendor is responsible for all initial activation and service fees associated with the 5-year term.</li> </ul> <p><strong>Logistics and Support</strong></p> <ul> <li><strong>Delivery:</strong> Inclusive of freight to <strong>Oklahoma City, OK</strong>, local dealer delivery, and professional assembly.</li> <li><strong>Compliance:</strong> Units must undergo a comprehensive "Pre-Flight" dealer inspection and safety test prior to handover.</li> </ul> Solicitation Number: 6973GH-26-Q-00084 Type: Solicitation Base Type: Solicitation NAICS: 333924 Classification Code: 3930 Response Deadline: 2026-05-01T17:00:00-05:00 Office Address: OKLAHOMA CITY, OK Place of Performance: Oklahoma City, Oklahoma POC: Edward Wright, edward.b.wright@faa.gov, 4059540693
What to check before bidding
- Located in United States.
- Source notice 926037f7532241078144a7f736d8945a on SAM.gov.
- Notice published 24 Apr 2026; Tenqual indexed it 26 Apr 2026.
- Deadline listed as 1 May 2026.
- Create a free tender alert to catch similar opportunities before the deadline pressure starts.