Purchaser
KIER TRANSPORTATION LIMITED
Country
United Kingdom
Published
21 Apr 2026
Closing date
Not listed
Source ID
Docs found
—
Unlock fit scoring for this notice, save it to your pipeline, and find similar public-sector opportunities that match your capabilities.
- See whether this tender is worth pursuing.
- Keep this notice and your bid workflow in one workspace.
- Track similar tenders without rebuilding the search manually.
Summary
The M6 Lune Gorge Structures Scheme requires Structural Monitoring across 6nr bridges, as well as CR monitoring to temporary piling on the scheme. The package will be split into 3 parts; Monitoring of the existing bridge substructures during demolition and replacement deck installation, monitoring of new construction considering settlement / tilt and vibration monitoring through construction and into post construction, and central reserve temporary embedded retaining walls works associated with piling / retaining wall construction. Tenderers will be required to propose an efficient manual / automated monitoring methodology meeting the stated frequencies, data capture, and reporting aligned with trigger and mitigation actions. Considerations around access and sequencing will be discussed. The package includes, but is not limited to: control points, baselining, routine monitoring (Ranging from daily to weekly), and maintenance.
Sign in to run AI fit scoring, bid/no bid reviews, and compliance drafting for this tender.