Tenqual homeBrowse public tender search
SAM.gov

Temp Chiller Rental

Unknown purchaserUnited States

Purchaser

Country

United States

Published

13 Apr 2026

Closing date

15 Apr 2026

Source ID

Docs found

Create a free account to save this tender

Save this notice and create a tender alert for similar public opportunities.

  • Create one free tender alert.
  • See a short explanation of why each tender matches.
  • Upgrade later when you want help planning and writing the bid.

Tender summary

<p>Chill Water Unit shall be a minimum 150 Ton Capacity Chiller.</p> <p>Must be air-cooled.</p> <p>Must be operable on a single 460/480 (V), <u>400 Amp</u> Breaker (<u>MAXIMUM</u>).</p> <p>Must be provided with a male 500 mcm Camlock electrical connection.</p> <p>Single Circulating pump (minimum).</p> <p><strong>CRITICAL SYSTEM SUPPORT: Unit must be capable of operating twenty-four (24) hours a day, seven (7) days a Week.</strong></p> <p>At a minimum, the pumping system shall be capable of providing 450 GPM at 300 feet of head pressure.&nbsp; Supplemental pumps may be provided if needed to meet required pressure/flow rates, but a pump integral to the chiller unit would be preferred.</p> <p>Unit must have two (2) each inlets. Inlets must be 2-1/2&rdquo; Male NPT. All inlet connections shall have isolation globe valves installed.</p> <p>Unit must have two (2) each outlets. Outlets must be 2-1/2&rdquo; Male NPT. All outlet connections shall have isolation globe valves installed.</p> <p>The gross weight of the unit shall be clearly marked on the outside of the unit as outlined in Paragraph 11.&nbsp; If the unit is not a complete unit, the gross weight of each component shall be clearly marked on each component.</p> <p>Unit must be free standing and have forklift slots (capable of being moved with a forklift).&nbsp; If the unit is not a complete unit, each component shall be capable of being moved with a forklift as well.</p> <p>Chiller Unit to be equipped with <u>operational</u> Inlet and Outlet Pressure Gages.&nbsp; Pressure gages are to be located on the contractor provided supply and discharge manifolds.</p> <p>Unit shall have an electronic monitoring system that monitors inlet and outlet temperatures and flow rates.</p> <p>Desired output water temperature range is 45&deg; F - 55&deg; F.</p> <p>Evaporator must be capable of delivering a leaving temperature of less than 45 &deg;F.</p> <p>Condenser must be capable of operating in a wide ambient temperature range (0-125 &deg;F).</p> <p>Shown in figure below, Contractor is to provide all equipment from the return manifold to the supply manifold. &nbsp;System shall be a complete unit.&nbsp; If pump is separate, vendor will provide and install all piping/valves/fittings as required to couple pump to the Chill Water Unit. &nbsp;Vendor is to provide extra fittings and hoses to support installation, as required. If the system requires assembly, the system shall be assembled in such a way that it does not cause tripping hazards by minimizing the lengths of hoses between components.&nbsp; If lengths of hoses are longer than needed, it should be able to be coiled and put somewhere out of the way of normal foot traffic.&nbsp; Hoses shall be routed in a way that does not cause the hose to kink and reduce flowrate.</p> <p>If chiller system holds 55 gallons or more of fuel or oil or similar fluid, provide an environmental catch tank capable of holding at least 110% of the capacity of the fuel, oil and other fluids required to operate the rental unit.</p> <p>Unit must be affixed with a metal tag designating the supplying company, a POC responsible for repairs and maintenance, and a phone number for the POC who is responsible for repairs and maintenance.</p> <p>Contractor must provide instruction manual and training as requested.</p> <p>Contractor provided equipment (i.e. hoses, manifolds, etc.) shall have insulation installed around them to reduce temperature losses in the Chill Water System.</p> <p></p> <p>Interested vendors should notify contract speicialist of their interest</p>

What to check before bidding

  • Located in United States.
  • Deadline listed as 15 Apr 2026.
  • Create a free tender alert to catch similar opportunities before the deadline pressure starts.