Tenqual homeBrowse public tender search
SAM.gov

DOA

Unknown purchaserUnited States

Purchaser

Country

United States

Published

10 Apr 2026

Closing date

17 Apr 2026

Source ID

Docs found

Create a free account to save this tender

Save this notice and create a tender alert for similar public opportunities.

  • Create one free tender alert.
  • See a short explanation of why each tender matches.
  • Upgrade later when you want help planning and writing the bid.

Tender summary

DI (2-ETHYLHEXYL) ADIPATE-COMMONLY CALLED DOA425 LBS PER 55-GAL DRUM MATERIAL MUST BE IN ACCORDANCE WITH (IAW) MIL-DTL-23443C, AND MANUFACTURERS MUST BE QUALIFIED WITHIN MCAAP PHAMPLET 702-13 QUALIFIED CHEMICALS. CERTIFCATE OF ANALYSIS CERTIFCATE OF CONFORMANCE AND SAFETY DATA SHEET ARE REQUIRED. COC/COA MUST INCLUDE MANUFACTURER NAME PRODUCT NAME/DESCRIPTION SPECIFICATION LOT/BATCH NUMBER MANUFACTURE/EXPIRATION DATE STATEMENT OF NO CHANGE IN MATERIALS OR PROCESSES AND SIGNATURE OF AUTHORIZED REPRESENTATIVE. PACKAGING LABELS WILL INCLUDE MANUFACTURER NAME PRODUCT NAME/DESCRIPTION LOT/BATCH NUMBER AND MANUFACTURE/EXPIRATION DATE COC/COA APPROVAL BY MCAAP AO REQUIRED BEFORE CONTRACT AWARD. SEE PAGE 2 FOR QPL-QUALIFIED PRODUCTS LIST AND DOA CERTIFICATE OF ANALYSIS TEST REQUIREMENTS. QPL-QUALIFIED PRODUCTS LIST:PRODUCT: MANUFACTURER:PLASTOMOLL DOA BASF CORPORATION EASTMAN DOA PLASTICIZER EASTMAN CHEMICAL COMPANYHATCOL 2908 HATCO CORPORATION DOA CERTIFICATE OF ANALYSIS TEST REQUIREMENTS:ATTRIBUTE: REQUIREMENT:SPECIFIC GRAVITY AT 25/25 � C 0.921 MIN. - 0.929 MAX.MOISTURE, WT.% 0.05 MAX.ACIDITY, WT% (ACETIC) 0.01 MAX.SAPONIFICATION NUMBER 300 MIN. ? 304 MAX.FLASH POINT, � C 196 MIN.FIRE POINT, � C 216 MIN.KINEMATIC VISCOSITY, 38 � C, mm2 /s 8.00 MIN. - 8.76 MAX.PREDICTED DELIVERY SCHEDULE AS FOLLOWS. 40800 LBS PER DELIVERY ON THE FOLLOWING DATES: 5/13/26, 5/20/26, 6/3/26, 6/10/26

What to check before bidding

  • Located in United States.
  • Deadline listed as 17 Apr 2026.
  • Create a free tender alert to catch similar opportunities before the deadline pressure starts.