The Radford Army Ammunition Plant (RFAAP) Modernized Pre-Mix and Nitro Cellulose (NC) Dehydration NG3 Facilities
Purchaser
—
Country
United States
Notice published
7 Apr 2026
Tenqual indexed
9 Apr 2026
Closing date
13 Apr 2026
Source ID
Docs found
—
Save this notice and create a tender alert for similar public opportunities.
- Create one free tender alert.
- See a short explanation of why each tender matches.
- Upgrade later when you want help planning and writing the bid.
Tender summary
Amendment 0001 of this Synopsis adds Attachment 2- Requests for Information. This is an A-E Synopsis in accordance with FAR 36.102. The Mission and Installation Contracting Command - Fort Drum is procuring Architect-Engineer (A-E) Design Services for the Modernized Pre-Mix and Nitrocellulose (NC) Dehydration Facilities at Radford Army Ammunition Plant (RFAAP). This procurement is conducted under the Brooks Architect-Engineer Act (40 U.S.C Section 1102) and Far subpart 36.102, which require that A-E contracts be negotiated on the basis of demonstrated competence and qualifications for the required professional services. The objective of this project is to prepare a 30% design for Nitro Cellulose (NC) Dehydration (including NC Shredding), hereinafter referred as NC Dehy, and Pre-Mix facilities at Radford Army Ammunition Plant (RFAAP) using the most modern, safe, environmentally friendly, and automated technologies to the maximum extent feasible.
What to check before bidding
- Located in United States.
- Source notice 26585410986a43f0b22b4d11912df1bb on SAM.gov.
- Notice published 7 Apr 2026; Tenqual indexed it 9 Apr 2026.
- Deadline listed as 13 Apr 2026.
- Create a free tender alert to catch similar opportunities before the deadline pressure starts.