USDA Forest Service Lake Wedington Waterline Construction, ARKANSAS
Purchaser
—
Country
United States
Notice published
6 Apr 2026
Tenqual indexed
8 Apr 2026
Closing date
24 Apr 2026
Source ID
Docs found
—
Save this notice and create a tender alert for similar public opportunities.
- Create one free tender alert.
- See a short explanation of why each tender matches.
- Upgrade later when you want help planning and writing the bid.
Tender summary
<p>Amendment 003 Updated Schedule B of Items for LI001 Distribution System and Provides Engineering Clarification for Change Request for 2”-8” Schedule 40 PVC Sleeving</p> <p>Amendment 002 Correct total POP to read 270 days from award (SF1442 block 11); No Later Than 29 Jan 2027. (Remove/Replace Page 1 of the SF1442.)</p> <p>Amendment 001 Correct the bid deadline of the SF1442. Remove/Replace Page 1 of the SF1442./Block 13a should reflect a deadline of 04/24/2026; 1000CT.</p> <p></p> <p>This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation; offers are being requested, and a separate written solicitation will not be issued.<br /> Solicitation number 12445126B0010 is issued as a Invitation for Bid (IFB) to This project will include elements from two separate designs: complete replacement of existing distribution lines (Package 001) and new potable water supply line (Package 002) at Lake Wedington Recreation Area, Fayetteville, Arkansas.<br /> Disclosure of the Magnitude of Construction Projects: The Magnitude of this project is between $1,000,000 and $2,000,000.<br /> This acquisition is set aside for small business concerns. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov.<br /> The applicable North American Industry Classification Standard Code is 237110 - Water and Sewer Line and Related Structures Construction. The small business size standard is $45 million. This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency.<br /> Statement of Requirement: This project will include elements from two separate designs: complete replacement of existing distribution lines<br /> (Package 001) and new potable water supply line</p> <p>(Package 002). The distribution system includes demolition of existing lines and valves and installation of approximately 16,000 linear feet of waterline (sizes range from 1-inch to 6-inch) from the existing Forest Service 22,000-gallon water storage tank to the day-use area and campground. The supply line includes installation of approximately 6000 linear feet of 3-inch waterline from Krie Road to the existing Forest Service 22,000-gallon water storage tank.<br /> Project Location: Lake Wedington Recreation Area, Fayetteville, Arkansas; Ozark-St. Francis National Forests. entrance gate to Lake Wedington Rec Area (west of Fayetteville, AR -off AR State Hwy 16). See Attachment 001through 003 for complete details.<br /> Schedule and Deadlines:<br /> Site Visit: 10 Mar 2026, 1000CT. Offerors are highly encouraged to attend the site visit. Meet at the entrance gate to Lake Wedington Rec Area (west of Fayetteville, AR - off AR State Hwy 16). USFS Point of Contact is Danny Sims (479) 223-2176, danny.sims@usda.gov.<br /> RVSP is requested by 07 Mar 2026 so we don't leave anyone behind!!!<br /> Questions Deadline: 27 Mar 2026. Questions shall be submitted via email to steven.alves@usda.gov; cc: adam.doyle@usda.gov and are due no later than March 27th, 2026. The subject line should read: 12445126B0010 QUESTION.<br /> Bids Deadline: 24 Apr 2026 - 1000 CT. All bids shall be received by 1000 CT and emailed to steven.alves@usda.gov cc: adam.doyle@usda.gov. Subject Line: 12445126B0010 BID_Co. Name **BIDDERS SHALL CALL THE CO/CS TO CONFIRM RECEIPT** This will avoid missed bids due to email quarantines that may occur.</p> <p>Period for acceptance of offers. The Offeror agrees to hold the prices in its offer firm for 90 calendar days from the date specified for receipt of offers. <br /> Period of Performance: 270 days after award/Completion no later than 29 JAN 2027</p>
What to check before bidding
- Located in United States.
- Source notice 07803de08b8848f9a08c6af11fa18342 on SAM.gov.
- Notice published 6 Apr 2026; Tenqual indexed it 8 Apr 2026.
- Deadline listed as 24 Apr 2026.
- Create a free tender alert to catch similar opportunities before the deadline pressure starts.