Tenqual homeBrowse public tender search
SAM.gov

UPS Maintenance

Unknown purchaserUnited States

Purchaser

Country

United States

Notice published

6 Apr 2026

Tenqual indexed

8 Apr 2026

Closing date

13 Apr 2026

Source ID

Docs found

Create a free account to save this tender

Save this notice and create a tender alert for similar public opportunities.

Tender documents

2 files identified

Create a free account to open the 2 files linked to this notice.

Files identified
  • Create one free tender alert.
  • See a short explanation of why each tender matches.
  • Upgrade later when you want help planning and writing the bid.

Tender summary

<p><strong>Statement Of Work</strong></p> <p><strong>UPS Maintenance and Repair</strong></p> <p></p> <p></p> <ol> <li><strong>BACKGROUND</strong></li> </ol> <p>Strategic Weapons Facility Pacific (SWFPAC) requires comprehensive maintenance and repair service contract for three (3) Uninterruptible Power Supply (UPS) units located at SWFPAC facilities on Naval Base Kitsap-Bangor in Silverdale, WA.</p> <p></p> <p>The purpose of this contract is to ensure the reliable operation of critical power infrastructure through proactive maintenance and timely emergency support.</p> <p></p> <p><strong>2. Equipment Covered:</strong></p> <p></p> <p><strong>Make </strong></p> <p><strong>Model</strong></p> <p><strong>Description</strong></p> <p><strong>Serial Number</strong></p> <p>APC</p> <p>SYCF40KF</p> <p>Symmetra PX UPS 20kVA 40 and/or PDU</p> <p>QD1633340704</p> <p>APC</p> <p>SYCF40KF</p> <p>Symmetra PX UPS 40kVA 40 and/or PDU</p> <p>QD1830240733</p> <p>APC</p> <p>SYCF40KF</p> <p>Symmetra PX UPS 40kVA 40 and/or PDU</p> <p>QD1830240729</p> <p></p> <ol> <li><strong>SCOPE:&nbsp;&nbsp;&nbsp; </strong></li> </ol> <p>The contractor shall provide all-inclusive preventative maintenance, on-site emergency repair, and remote technical support for the UPS equipment listed in paragraph 2. To ensure the manufacturer&#39;s warranty remains valid, services must be delivered by an American Power Conversion (APC)-certified or authorized service provider. All components, parts, and consumables used for maintenance or repair must be new, genuine original equipment manufacturer parts that meet APC specifications.</p> <p></p> <p><strong>3.1. Technical Support</strong></p> <p>The contractor shall provide 24 hours a day, 7 days a week, 365 days a year (24/7/365) telephone and email access to a technical support center for troubleshooting and service dispatch.</p> <p></p> <p><strong>3.2. On-Site Support </strong></p> <p>Emergency On-Site Response:&nbsp;For any critical failure resulting in a loss of redundancy or an inability to support the protected load, a qualified technician must arrive on-site&nbsp;within six (6) hours&nbsp;of the service request being logged. This six (6) hour response shall be guaranteed 24/7/365.</p> <p></p> <p>Standard On-Site Response: For non-critical failures where the UPS remains operational, a qualified technician must arrive on-site no later than the next business day.</p> <p></p> <p>Parts &amp; Labor:&nbsp;This contract shall cover 100% of the costs for all replacement parts, hardware, capacitors, fans, and any other components needed to restore the UPS units listed in paragraph 2 to full operational status. All associated labor, travel, and expenses for on-site visits shall be included.</p> <p></p> <p>Equivalent Hardware:&nbsp;If a failed hardware component is no longer manufactured, it shall be replaced with an equivalent or superior component that is fully compatible.</p> <p></p> <p><strong>3.3. Preventative Maintenance (PM)</strong></p> <p>The contractor shall perform one (1) scheduled on-site preventative maintenance visit during the contract period. This visit shall include all UPS units listed in paragraph 2.</p> <p>The PM service must include, at a minimum, the following tasks for each UPS:</p> <ul> <li>Visual Inspection:&nbsp;Check for loose connections, overheating, component discoloration, and physical defects.</li> <li>Environmental Checks:&nbsp;Measure and record ambient temperature and humidity.</li> <li>Cleaning:&nbsp;Clean and remove dust/debris from the interior and exterior of the UPS.</li> <li>Electrical Checks:&nbsp;Perform thermal scans on electrical connections to identify potential failure points. Check and tighten all terminal connections as needed.</li> <li>Battery Maintenance:&nbsp;Conduct a full battery string inspection, including voltage checks, impedance testing, and a system load test to verify battery performance and runtime.</li> <li>System Calibration:&nbsp;Calibrate and verify all system alarms, setpoints, and transfer mechanisms.</li> <li>Firmware &amp; Software:&nbsp;Review installed firmware and operating system software. Install any necessary updates, patches, or security fixes after receiving approval from SWFPAC personnel.</li> <li>Functional Test:&nbsp;Perform a full functional test to ensure the unit operates correctly in all modes (e.g., normal, battery, bypass).</li> </ul> <p></p> <p><strong>4. DELIVERABLES</strong></p> <p>The following deliverables are required:</p> <p>Field Service Report: After each preventative maintenance visit or emergency repair, the contractor shall provide a detailed electronic service report within five (5) business days. This report must document all work performed, tests conducted, parts replaced, and findings or recommendations.</p> <p>Annual System Health Report: At the conclusion of the contract period, the contractor shall provide a summary report detailing the overall health of the UPS fleet, a summary of service activities for the year, and recommendations for future maintenance or upgrades.</p> <p></p> <p><strong>5. CONTRACTOR &amp; PERSONNEL REQUIREMENTS</strong></p> <p>Certification: All on-site technicians must be certified by APC to work on the specified UPS models. Proof of certification may be requested.</p> <p>Security &amp; Access: The contractor and its personnel must comply with all SWFPAC security protocols, including requirements for background checks, site access, and safety procedures. The contractor will be escorted at all times unless prior arrangements are made.</p> <p>Base Access: Contractors must be able to gain access to SWFPAC on Naval Base Kitsap &ndash; Bangor,</p> <p>WA.&nbsp; Base access may be granted using the Rapid Gate System, DBIDS System, or other approved base</p> <p>access system at the Contractor&rsquo;s expense.&nbsp; Once base access is granted, Contractors will be required to</p> <p>apply for a visitor badge (BAVR request) at https://www.bavr.cnic.navy.mil/.&nbsp; Coordination of the visitor</p> <p>badge will be through the Government Point of Contract.</p> <p></p> <p>Vehicle Pass: In order to drive a non-Government vehicle to the work location, the contractor must</p> <p>submit a SWFPAC Vehicle Pass Request and required documents to the COR.&nbsp; The non-Government</p> <p>vehicle must be registered in the company&rsquo;s name and must have a clear logo displayed on the vehicle</p> <p>indicating the company it is registered to.&nbsp; When entering the base, the vehicle must have the approved</p> <p>vehicle pass displayed in the driver&rsquo;s side windshield at all times.&nbsp; No Bluetooth, telephonic, or electronic</p> <p>devices are allowed in secured locations on base.&nbsp;</p> <p></p>

What to check before bidding

  • Located in United States.
  • Source notice dbf322459eff4368901db8386c41a8e5 on SAM.gov.
  • Notice published 6 Apr 2026; Tenqual indexed it 8 Apr 2026.
  • Deadline listed as 13 Apr 2026.
  • 2 tender documents identified.
  • Create a free tender alert to catch similar opportunities before the deadline pressure starts.