Tenqual homeBrowse public tender search
SAM.gov

LCO2 Tank

Unknown purchaserUnited States

Purchaser

Country

United States

Published

1 Apr 2026

Closing date

10 Apr 2026

Source ID

Docs found

Create a free account to save this tender

Save this notice and create a tender alert for similar public opportunities.

  • Create one free tender alert.
  • See a short explanation of why each tender matches.
  • Upgrade later when you want help planning and writing the bid.

Tender summary

<p>Spangdahlem AB is conducting market research for the below requirement. Be advised, this is NOT a solicitation, nor does it guarantee a solicitation for this requirement to be posted in the future.</p> <p>This is an official request for information (RFI)&nbsp;to notify prospective offerors. Feedback is encouraged. Quotes are not currently being requested.&nbsp;<strong>Currently, there is no specialised foundation for the LCO2 tank to stand upon: is a specialised foundation required and if so, what specifications would such a foundation have to fulfill to safely support a long-term positioning of a LCO2 tank?</strong></p> <p>The purpose of this requirement is to provide a liquid CO2 storage tank with the following draft-requirements:<br /> The tank should have a capacity of 6,000 - 7,000 liters and be a vacuum-insulated double wall tank consisting of two concentric vessels, a low-temperature resistant austenitic steel inner tank and an outer tank made of carbon steel with an anti-corrosion primer and a top coat of paint. The interspace between the two tanks should be filled with perlite insulating powder and an absorbent to maintain a vacuum pressure of &lt; 0.05 millibar during tank operation. The maximum allowable working pressure for the inner vessel must be 22 bar gauge for temperatures ranging from -196&deg; up to 20&deg;C. It must supply pressurized LCO2 at 189-261 psi (13-18 bar) to a Dry Ice Production Hub through a flexible hose attachment.&nbsp;It will include a safety valve system to prevent overpressurizaton and a safety shutoff valve. The tank must be manufactured and tested in accordance with EU 97/23/EC and EN 13458. The company&#39;s Quality Management System must satisfy all elements of the EN ISO 9001/2000 program or ASME (U, U2, R-Stamp).</p> <p></p>

What to check before bidding

  • Located in United States.
  • Deadline listed as 10 Apr 2026.
  • Create a free tender alert to catch similar opportunities before the deadline pressure starts.