Purchaser
—
Country
United States
Published
31 Mar 2026
Closing date
13 Apr 2026
Source ID
Docs found
—
Save this notice and create a tender alert for similar public opportunities.
- Create one free tender alert.
- See a short explanation of why each tender matches.
- Upgrade later when you want help planning and writing the bid.
Tender summary
<p>The subcontractor must provide all labor, oversight, tools, materials, equipment, and services necessary to complete the work safely and in compliance with approved BIO documents as well as SLAC, DOE, and ES&H standards. The subcontractor shall remove and replace, in its entirety, the HVAC systems servicing the Beam Position Monitor (BPM) Rooms in Buildings 116 and 132.<br /> All construction activities must be performed primarily during SSRL’s Summer 2026 shutdown, scheduled from July 21, 2026 through October 1, 2026, with the HVAC system operational no later than September 19, 2026. If equipment lead times prevent full completion by this date, the project shall be phased to complete as much work as possible during the Summer 2026 shutdown, with any remaining work performed during the Summer 2027 shutdown.</p> <p></p> <p><strong>NOTE: The SOW is currently being revised, and I expect to upload an updated version to this posting this week. The site walk has been POSTPONED and is currently TBD; I will notify all interested vendors once the date is confirmed.</strong></p>
What to check before bidding
- Located in United States.
- Deadline listed as 13 Apr 2026.
- Create a free tender alert to catch similar opportunities before the deadline pressure starts.