Tenqual homeBrowse public tender search
SAM.gov

HVAC

Unknown purchaserUnited States

Purchaser

Country

United States

Notice published

30 Mar 2026

Tenqual indexed

31 Mar 2026

Closing date

27 Mar 2026

Source ID

Docs found

Create a free account to save this tender

Save this notice and create a tender alert for similar public opportunities.

  • Create one free tender alert.
  • See a short explanation of why each tender matches.
  • Upgrade later when you want help planning and writing the bid.

Tender summary

<p>Manufacturing, delivery and assembly of entire air conditioning system, consisting of:<br /> 1. Job Site Mobilization<br /> - Construction site setup<br /> - Work platform, scaffolding, and/or ladders. Installation height: max. 3.50 m above floor.</p> <p>2. Air conditioning system, consisting of:<br /> Description: REMKO MVV 2003 DC<br /> Quantity: 1 each<br /> Manufacturer: Remko</p> <p>Model: MVV 2003 DC<br /> Item number: 1623680</p> <p>Description: Floor console BK-1000 Plus S<br /> Quantity: 1 each<br /> Manufacturer: Remko<br /> Model: BK-1000 Plus S<br /> Item number: 1613273</p> <p>Description: Condensate collection tray incl. oil separator MVV 2000/Duo<br /> Quantity: 1 each<br /> Manufacturer: Remko<br /> Model: MVV 2000/Duo<br /> Item number: 260128</p> <p>Description: REMKO MVW 222<br /> Quantity: 9 each<br /> Manufacturer: Remko<br /> Model: MVW 222<br /> Item number: 1623504</p> <p>Description: KFB-4 wired remote control<br /> Quantity: 9 each<br /> Manufacturer: Remko<br /> Model: MVD 222-1002/MVW 222-562<br /> Item number: 1613269<br /> - Fixed price for the refrigeration connection of indoor air conditioning units in connection with<br /> the technical handover of equipment by REMKO (also for A2L refrigerants in accordance with<br /> DIN EN 60335-2).<br /> - The contractor must announce all necessary power requirements for CTS pre-installation.</p> <p>3. Pipe network:<br /> Refrigerant pipes made of seamless drawn copper from Cu-DHP, strength R220 soft according to<br /> EN 12735-1, cleaned inside, pipe ends sealed, with factory-fitted thermal insulation made of<br /> modified polyethylene according to DIN EN 14313 with structured white protective film. Building<br /> material class flame retardant CL s1 d0 according to DIN EN 13501-1, does not drip when burning,<br /> minimal smoke development. Permissible operating pressure 169 bar with 3-fold safety up to 100 &deg;C<br /> according to EN 14276.<br /> Installation of pipes in accordance with DIN EN 378-2 and DKI i.164, copper pipes in refrigeration<br /> and air conditioning technology. Brazing using silver or phosphorus solders in a protective gas<br /> atmosphere. Pressing with special press fittings for refrigerant-carrying pipes in accordance with<br /> DIN EN ISO 14903.<br /> <br /> Brazing is carried out using brazing alloys in accordance with DIN EN ISO 17672, recommended<br /> brazing alloys CuP 179 or CuP 279, if necessary, fluxes in accordance with DIN EN 1045 type<br /> FH10 must be used. For solders AG 134, AG 145, and AG 244, use flux in accordance with DIN<br /> EN 1045. Type: FH 10. Brazed joints may only be made by qualified personnel. Before and during<br /> the joining process by brazing or welding, the pipes must be flushed with dry protective gases, e.g.,<br /> inert gases (noble gases, nitrogen, and mixtures thereof) or forming gases (e.g., nitrogen-hydrogen,<br /> nitrogen-argon, etc., max. hydrogen content 4 vol.%). When using capillary solder and press fittings,<br /> consult the respective fitting manufacturer regarding the possible areas of application, particularly<br /> the maximum permissible operating pressures.<br /> Pipe network consisting of following components:</p> <p>Description: Refrigeration pipe, insulated, installed according to design.<br /> Quantity: according to design<br /> Manufacturer: Remko<br /> Model: 3/8&rdquo;, 3/4&rdquo;, 1/4&rdquo;, 1/2&rdquo;,<br /> Item number: 260128</p> <p>Description: Y-distributor set for MVV AT/IT fluid and suction line<br /> Quantity: 2 sets<br /> Manufacturer: Remko<br /> Item number: 1611095</p> <p>Description: 4-way distributor set for liquid gas and suction line<br /> Quantity: 2 sets<br /> Manufacturer: Remko<br /> Item number: 1611096</p> <p>Description: Condensation hose 16/18 mm diameter, per meter<br /> Quantity: 1 each per wall unit<br /> Manufacturer: Remko<br /> Item number: 1613053</p> <p>Description: Condensation pump KP-6<br /> Quantity: 1 each per wall unit<br /> Manufacturer: Remko<br /> Item number: 1613251</p> <p>The installation of the distribution sets involves connecting and soldering the refrigerant lines<br /> already connected by the installer to the distributors. Since absolute cleanliness must be ensured<br /> in this complex pipe system, soldering is carried out under dry nitrogen.<br /> <br /> 4. Miscellaneous / Additional services, special services:<br /> - The pipe dimensions must be checked by the contractor and adjusted if necessary.<br /> - The contractor must adjust the system components so that the planned functions and<br /> performance are achieved and the legal requirements are met. The air volume flows must be<br /> adjusted in accordance with the calculated settings. Measured values must be documented.<br /> - The contractor shall provide one-time training for the operating and maintenance personnel for<br /> the system. Leading time for coordination: 2 weeks.<br /> - If necessary, the delivery and installation of special fastening structures, e.g., brackets and<br /> support frames is also part of this contract.<br /> - Delivery of the operating materials and media required for commissioning and trial operation,<br /> particularly the required refrigerant R 410A.</p> <p>5. As-built documentation<br /> As-built documentation, digital revision documents in German and English language including:<br /> - System diagrams.<br /> - General electrical diagrams and connection diagrams in accordance with DIN EN 61082-1</p> <p>&ldquo;Electrotechnical documentation &rdquo;<br /> - Compilation of the key technical data.<br /> - Copies of the required test and manufacturer certificates.<br /> - All operating and maintenance documents, required for safe and economical operation.<br /> - Protocol on the training of maintenance and operating personnel.</p> <p>FAR 52.225-5, Trade Agreements&ldquo;One or more of the items under this acquisition is subject to the World Trade Organization Government Procurement Agreement and Free Trade Agreements.</p>

What to check before bidding

  • Located in United States.
  • Source notice 4fb2e1bf5dc849d88d6c222f1b8034ab on SAM.gov.
  • Notice published 30 Mar 2026; Tenqual indexed it 31 Mar 2026.
  • Deadline listed as 27 Mar 2026.
  • Create a free tender alert to catch similar opportunities before the deadline pressure starts.