Tenqual homeBrowse public tender search
TED

Supply of equipment – EV Chargers

Purchaser

Centre for development of the South-East planning region

Country

MKD

Published

13 Feb 2026

Closing date

Not listed

Source ID

Docs found

Create a free account to save this tender

Save this notice and create a tender alert for similar public opportunities.

  • Create one free tender alert.
  • See a short explanation of why each tender matches.
  • Upgrade later when you want help planning and writing the bid.

Tender summary

The contract concerns the supply, delivery, installation, connection, testing and commissioning of six fast electric vehicle (EV) charging stations in the South­East of North Macedonia, to be installed in the municipalities of Strumica, Gevgelija, Valandovo, Radovish, Dojran and Novo Selo. The charging stations shall be supplied in accordance with the technical specifications defined in the tender documentation and shall fully comply with all applicable EU safety, technical and performance standards. Each charging station will be mounted on an appropriate concrete foundation and connected to the electrical grid, including all necessary civil, electrical and auxiliary works required for full operational readiness. The scope of the contract includes, but is not limited to: • Supply, delivery and installation of the EV charging stations with the technical characteristics defined in the tender specifications; • construction of foundation bases for each charging station; • electrical connection works, including cable lines, disconnection boxes and all required protective elements; • installation of vehicle stop elements and vertical and horizontal traffic signage and markings related to the charging points; • testing and commissioning of the installed equipment to ensure safe and proper operation. The contractor shall also provide training for designated local personnel on the operation and routine maintenance of the charging stations, as well as warranty coverage and aftersales support throughout the warranty period. All required documentation, certificates of conformity, technical manuals and as­built documentation must be delivered to ensure correct use, maintenance and long­term functionality of the equipment. Delivery, installation, testing and commissioning of the charging stations must be completed within the timelines defined in the project implementation schedule. The charging infrastructure is intended to promote sustainable transport, encourage low­carbon mobility and contribute to the development of regional electric vehicle infrastructure.

What to check before bidding

  • Issued by Centre for development of the South-East planning region.
  • Located in MKD.
  • No closing date is listed yet.
  • Create a free tender alert to catch similar opportunities before the deadline pressure starts.