Purchaser
SCK CEN Stichting van Openbaar Nut
Country
Belgium
Published
29 Dec 2025
Closing date
Not listed
Source ID
Docs found
—
Unlock fit scoring for this notice, save it to your pipeline, and find similar public-sector opportunities that match your capabilities.
- See whether this tender is worth pursuing.
- Keep this notice and your bid workflow in one workspace.
- Track similar tenders without rebuilding the search manually.
Summary
This assignment concerns the engineering & design, procurement, manufacturing, installation and commissioning of the HELIOS-Pb facility based on the conceptual design provided by the client. For SCK CEN this represents a turn-key project: the contractor will manage the entire process from design to delivery, providing a complete, ready-to-use product or facility for the contracting authority. The installation (part of the SMR-LFR program) will be a pool-type liquid lead facility capable of establishing and maintaining controlled thermal and chemical conditions representative of lead-cooled reactor environments. The system shall enable reliable operation in the nominal temperature range of 380–430 °C, extendable up to 500 °C.
Sign in to run AI fit scoring, bid/no bid reviews, and compliance drafting for this tender.