Purchaser
—
Country
United States
Published
23 Dec 2025
Closing date
6 Jan 2026
Source ID
Docs found
—
Save this notice and create a tender alert for similar public opportunities.
1 file identified
Create a free account to open the 1 files linked to this notice.
- Create one free tender alert.
- See a short explanation of why each tender matches.
- Upgrade later when you want help planning and writing the bid.
Tender summary
Statement of Work (SOW) Project Title: Replacement, Installation, and Calibration of CAT 10R-9661 - Kit ELEK GP Controller on both SSDG’s aboard CGC GASCONADE Background The purpose of this project is to replace both existing controllers on the cutters SSDG’s with the CAT 10R-9661 - Kit ELEK GP, ensuring proper installation and calibration in accordance with the manufacturer's instructions. This work is critical to maintaining the operational efficiency and reliability of the equipment. Contractor Furnished Equipment Qty 2 – CAT Kit ELEK GP – 10R-6991 3. Scope of Work The contractor shall provide all necessary labor, tools, equipment, and expertise to perform the following tasks: Removal of Old Controller: Safely disconnect and remove the existing controllers from the equipment. Ensure no damage is caused to surrounding components during removal. Installation of New Controller: Install the CAT 10R-9661 - Kit ELEK GP controllers in accordance with the manufacturer's specifications. Verify that all connections are secure and properly aligned. Calibration of Controller: Calibrate the newly installed controllers per the manufacturer's instructions. Ensure the controllers are functioning optimally and meets operational requirements. 4. Deliverables The contractor shall provide the following: Two fully installed and calibrated CAT 10R-9661 - Kit ELEK GP controllers. Documentation of calibration settings and procedures performed. A brief report confirming the successful completion of the work and equipment functionality. 5. Period of Performance The work shall be completed within 5 business days from the start date agreed upon by the contractor and the project manager. 6. Location of Work The work will be performed at CGC GASCONADE, 100 Arsenal Street, ST. Louis MO, 63118 7. Contractor Responsibilities The contractor shall: Comply with all safety regulations and standards during the execution of work. Provide qualified personnel to perform the tasks outlined in this SOW. Ensure all tools and equipment used are in good working condition. 8. Government Furnished Equipment (GFE) None 9. Acceptance Criteria The work will be considered complete when: The old controllers have been removed without damage to the equipment. The new controllers have been installed and calibrated per the manufacturer's instructions. The equipment is fully operational and meets performance standards. 10. Points of Contact Questions related to anything listed within this statement of work, or access to the ship should be directed to: MKCS Matt Morin, 571-607-9267, matthew.j.morin@uscg.mil Solicitation Number: 70Z08526Q0002157 Type: Combined Synopsis/Solicitation Base Type: Combined Synopsis/Solicitation NAICS: 336611 Classification Code: J020 Response Deadline: 2026-01-06T08:00:00-08:00 Office Address: ALAMEDA, CA Place of Performance: Saint Louis, Missouri, 63118 POC: DONNA O'NEAL, Donna.J.O'Neal@uscg.mil, 5103931145 POC: Lindsay Mongiovi, lindsay.n.mongiovi@uscg.mil, 5716086752
What to check before bidding
- Located in United States.
- Deadline listed as 6 Jan 2026.
- 1 tender document identified.
- Create a free tender alert to catch similar opportunities before the deadline pressure starts.