Battery energy storage system in EBO (BESS EBO)
Purchaser
Slovenské elektrárne, a.s.
Country
Slovakia
Published
22 Dec 2025
Closing date
Not listed
Source ID
Unlock Tenqual’s AI workspace
Sign in to run fit scoring, collaborate with your team, and attach supporting documents. Subscriptions keep this tender and similar ones in sync with your capability folders.
Summary
The objective of the project is the supply, construction and commissioning of a battery storage system (BESS) with an installed capacity of minimum 89 MW in two units of 2 x 44.5 MW and a total capacity of minimum 178 MWh, on the existing site of the Slovak Nuclear Power Plants, where the capacity of the storage system must be twice the installed capacity.
Sign in to run AI fit scoring, deep dives, and compliance drafting for this tender.