Design Build and Operate (DBO) of the Wadi Zarqa Wastewater Treatment Plant Phase 1
Purchaser
Water Authority of Jordan (WAJ)
Country
JOR
Published
5 Dec 2025
Closing date
Not listed
Source ID
Sign in to run fit scoring, collaborate with your team, and attach supporting documents. Subscriptions keep this tender and similar ones in sync with your capability folders.
Summary
Wadi Zarqa WWTP, based on current flow projections, is planned to be implemented in two phases: Phase 1 aims to achieve a wastewater treatment of 150,000 m3/day by 2030. Phase 2 is planned to add additional capacity of 200,000 m3/day to Phase 1, achieving a total project capacity of 350,000 m3/day by 2034-2035. The project scope, is for the Design, Build and Operate of the Phase 1 of Wadi Zarqa Wastewater Treatment Plant (WWTP) and associated facilities. The project scope includes but is not limited to the design, permitting, supply, delivery, construction, commissioning, operation, maintenance and transfer of the Wadi Zarqa WWTP, with a Phase 1 treatment capacity of 150,000 m3/d, an approximately 1.4 MW hydropower plant, the conveyance system from the West Zarqa Pump Station (WZPS) to Wadi Zarqa WWTP including 12 km of pipeline with a diameter to be confirmed (estimated at up to 1,600 mm), as well as the expansion of the pre-treatment facility at WZPS.
Sign in to run AI fit scoring, deep dives, and compliance drafting for this tender.