New Containment Cell upgrade - Cap-Lumière, Kent County, New Brunswick
Purchaser
Department of Fisheries and Oceans (DFO)
Country
Canada
Published
26 Nov 2025
Closing date
17 Dec 2025
Source ID
Docs found
—
Save this notice and create an alert so Tenqual can send similar public tenders to your email.
- Get similar tenders sent to your email.
- See a short explanation of why each tender matches.
- Upgrade later when you want help planning and writing the bid.
Summary
Title New Containment Cell upgrade Location Cap-Lumière, New-Brunswick General Requirements In general, the work under this contract at Cap-Lumière harbour located in New-Brunswick covers, but is not limited to the following; furnishing of all labour, all products (i.e.: materials, machinery, equipment and appliances), all construction material and all services that may be necessary for the execution of the work in accordance with the contractual documents for the construction of a new containment cell at Cap-Lumiere, Kent County, New Brunswick. The work covered by this contract includes, but is not limited to: 1 Removal of existing armour stone to excavation limit and disposal to the designated area; 2 Reshape the existing armour stone to suit the new berm construction; 3 Supply and placement of new corestone, filterstone and armourstone including geotextile shown on the drawing. Contract includes mobilization and demobilization all equipment necessary to make work progress for the entire contract, including environmental controls and all associated items in strict accordance with specifications and accompanying drawings and subject to all terms and condition of this contract. Familiarization with Site Before submitting a bid, it is recommended that bidders visit the site and its surroundings, at their own expense and schedule, to review and verify the form, nature and extent of the work, materials necessary for the completion of the works, the means of access to the site, severity, exposure and uncertainty of weather, soil conditions, any accommodations they may require, and in general shall obtain all necessary information as to risks, contingencies and other circumstances which may influence or affect their bid. No allowance shall be made subsequently in this connection on account of error or negligence to properly observe and determine the conditions that will apply. Take all appropriate safety measures before conducting any visit to site. All work must be substantially completed by May 2nd, 2026.
Sign in to run AI fit scoring, bid/no bid reviews, and compliance drafting for this tender.