Tenqual homeBrowse public tender search
TED

TBESS EPC

Trianel BESS 1 GmbH & Co. KGGermany

Purchaser

Trianel BESS 1 GmbH & Co. KG

Country

Germany

Published

20 Nov 2025

Closing date

Not listed

Source ID

Docs found

Create a free account to save this tender

Save this notice and create a tender alert for similar public opportunities.

  • Create one free tender alert.
  • See a short explanation of why each tender matches.
  • Upgrade later when you want help planning and writing the bid.

Tender summary

The subject matter of the contract is the engineering, procurement and construction (EPC) of a lithium-ion battery storage facility with 80 MW of active power consumption and feed-in and a usable storage capacity of at least 160 MWh at the time of commissioning. It also within the allocated land plot. includes the inverters and transformer stations since there is 33 kV voltage at the grid connection point, as well as the electrical connection 33kV switching station up to the connection point at the point of connection of the transformer stations to the grid connection point and all ancillary equipment and infrastructure necessary for proper and safe operation. Construction will take place on the site of Trianel Batteriepark Waltrop GmbH & Co. KG (TBW) in 45731 Waltrop, Germany. For further information please see tender documents.

What to check before bidding

  • Issued by Trianel BESS 1 GmbH & Co. KG.
  • Located in Germany.
  • No closing date is listed yet.
  • Create a free tender alert to catch similar opportunities before the deadline pressure starts.