ROI for Main Contractor for Epsom House Shower Block and Accessible Toilet Upgrade
Purchaser
Board of Trustees - Approve by BoT - ie. School Principal
Country
—
Published
27 Aug 2025
Closing date
15 Sept 2025
Source ID
Docs found
—
Unlock fit scoring for this notice, save it to your pipeline, and find similar public-sector opportunities that match your capabilities.
- See whether this tender is worth pursuing.
- Keep this notice and your bid workflow in one workspace.
- Track similar tenders without rebuilding the search manually.
Summary
RFx ID: 32353137Organisation: Ministry of Education - School InfrastructureOpen date: Wednesday, 27 August 2025 9:00 AM +12:00Close date: Monday, 15 September 2025 4:00 PM +12:00Categories: 72000000 - Building and Facility Construction and Maintenance ServicesRegion: AucklandOverview: Epsom Girls Grammar School intends to upgrade the existing shower block and accessible bathroom facilities at Epsom House, the school’s boarding accommodation. The project involves refurbishing the current toilet and shower facilities and converting these spaces into a fully compliant accessible shower and toilet facility. The construction must meet all relevant building codes, accessibility standards, and the Ministry of Education’s design requirements. An asbestos and timber condition survey are currently being undertaken to confirm the presence of asbestos-containing materials (ACM) and any rotten timber framing, both of which are suspected within the existing structure. The successful delivery of this project will require quality workmanship, full compliance, and timely completion, as the upgraded facility must be fully operational before the arrival of new boarding students in 2026. Epsom Girls Grammar School intends to upgrade the existing shower block and accessible bathroom facilities at Epsom House, the school’s boarding accommodation. The project involves refurbishing the current toilet and shower facilities and converting these spaces into a fully compliant accessible shower and toilet facility. The construction must meet all relevant building codes, accessibility standards, and the Ministry of Education’s design requirements. An asbestos and timber condition survey are currently being undertaken to confirm the presence of asbestos-containing materials (ACM) and any rotten timber framing, both of which are suspected within the existing structure. The successful delivery of this project will require quality workmanship, full compliance, and timely completion, as the upgraded facility must be fully operational before the arrival of new boarding students in 2026.
Sign in to run AI fit scoring, bid/no bid reviews, and compliance drafting for this tender.