Tenqual homeBrowse public tender search
TED

AC power converter units

Aalborg Universitet

Purchaser

Aalborg Universitet

Country

Published

27 Aug 2025

Closing date

Not listed

Source ID

Docs found

Create a free account to score this tender

Unlock fit scoring for this notice, save it to your pipeline, and find similar public-sector opportunities that match your capabilities.

  • See whether this tender is worth pursuing.
  • Keep this notice and your bid workflow in one workspace.
  • Track similar tenders without rebuilding the search manually.

Summary

Aalborg University - AAU Energy is set to create a new hybrid Energy Storage (HES) facility representing a pioneering advancement in scalable, controllable, modular, and flexible energy storage solutions. This cutting-edge facility addresses critical challenges in grid stability, power quality management, and future renewable energy integration while providing essential grid balancing services. The HES facility integrates storage technologies, including Supercapacitors and Battery modules, coupled with Power Electronic interfaces, a Real-Time Digital Simulator, and a Linear Power Amplifier. Operating at a 750-kW capacity level, the facility is designed to: • Stabilize power demand fluctuations from renewable energy sources • Enable both grid-connected and islanded operational modes • Support energy services and power system-level applications The Contracting Authority puts out to announcement the purchase of AC Power converter units.

Sign in to run AI fit scoring, bid/no bid reviews, and compliance drafting for this tender.

AC power converter units | Tenqual Tender